Forum quick links
Number of sampling location
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Caroline PIN on
Dear all, Does anyone know if there is an ACP rule for sampling points for the air quality tests.
Development Density Calculations
CS-2009 SSc2:Development density and community connectivityposted by Amanda Johnson on
For the Development Density calculations our project has an 880 ft DD radius .
Elevator lobbies -with airlocks?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Florian Schmidtchen on
Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.
Erosion and Sedimentation Control - Log
EBOM-2009 SSc3:Integrated pest management, erosion control, and landscape management planposted by Nicole Isk on
Hi, i got the follwoing comment from the review team on SSc3, and this is the first time i got this comment. Maybe, anyone can help me, what exactly they want me to do.
Circulation space around the building core
CS-v4 EQc4:Daylightposted by Julien Richard on
For Core&Shell projects, the reference guide specifies : “Assume that the entire floor plate, except for the core, will be regularly occupied space “.
Bus shuttle Service to previous location
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Doreen Kruschina on
We have a project in Gallin, a small town with almost no public transport facilities.
Certify only one floor among three floors that are rented
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Diana Nezamutinova on
Would you please advise if one newly acquired floor of a 3-floor office eligible to get certified under LEED v.4 Commercial Interiors (see details below)? - A company XYZ has been renting 2 adjac
LEED Site boundary – underground parking
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Florian Schmidtchen on
Hello all, We are working on a project with 2 stories for underground parking. About the half of the parking space is built for building users as required by local zoning requirements.
Tenants Obliged to Share Data with USGBC?
CS-2009 EAc5.2:Measurement and verification - tenant submeteringposted by Ian McCall on
Hello All, Are tenants obliged to share their energy data with USGBC for any period of time?
Anti corrosion paint under fire retarding
NC-v4 EQc2:Low-emitting materialsposted by Elodie DUMAS on
Our contractor must spread an anti corrosion paint under a fire retarding flocking (on a metallic structure).