Forum quick links
LEED Online V4 problems
NC-2009 IDc2:LEED Accredited Professionalposted by Susannah Goddard on
I am trying to claim this credit on the LEED Online v4 platform.
EAp2 "USGBC approved equivalent"
NC-2009 EAp2:Minimum energy performanceposted by Susannah Goddard on
I am working on a project in the UK and the client wants to know what the alternatives are to ASHRAE 90.1 for energy modelling to demonstrate compliance with EAp2 and EAc1.
FTE for campus or for building
NC-2009 WEp1:Water use reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
Alternative Walkability Features
Pilot-Credits PC14:Walkable Streetsposted by Emily Loquidis on
Has anyone successfully submitted alternative approaches other than the 9 factors listed within the credit requirements.
Reasonable Site Boundary
CS-2009 MPR3:Must use a reasonable site boundaryposted by Mindaugas Mi on
Dear Leeduser.com members. I have a question regarding correct LEED boundary. 1.
Old concrete
CS-2009 SSc7.1:Heat island effect - nonroofposted by Maria Glädt on
Hi! Our project is a renovation project on a site with old concrete stones. Is it ok to document count with the SRI for new concrete? How shall it be documentet?
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, My understanding from the LEED manual is that the credit does not require provision of a dedicated cycle lane between the building and the bicycle network and I was wondering if someone cou
Help with LEED assessment from USGBC?
posted by Susannah Goddard on
I am undertaking a LEED assessment on a large project in the UK. We have undergone the Design Stage Review (both preliminary and final) and have some outstanding issues to be appealed.
Contaminated soil found during excavation.
CS-2009 SSc3:Brownfield redevelopmentposted by Martin Meehan on
The project involved the demolition of a existing building that had asbestos present on it.
Rainwater Harvesting for Toilet Flushing
NC-v4 WEp2:Indoor water use reductionposted by Patrice McVeigh on
Hello all, Can rainwater harvesting be used to reduce the indoor water consumption percentage?