Forum quick links
Switching between Options 1 and 2
CI-v4 EAc2:Optimize energy performanceposted by Meike Borchers on
We have submitted our initial design stage submittal and received commentary on our Option 2 approach - Prescriptive compliance.
Discrepancy between credit requirements and credit specifics
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on
I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different pro
Water Use Reduction Calculator
NC-2009 WEp1:Water use reductionposted by Susannah Goddard on
I'm hoping to run by our approach to achieving WEp1 by some experienced LEED APs in the hope to reassuring myself that our approach is acceptable before submitting to USGBC at appeal.
Paints or sealants applied before building is sealed
CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Patrice McVeigh on
Hi, If paints /sealants /adhesives are being applied on site but before the building has been enclosed do they still need to comply with the associated VOC limits?
Open Space: Fence
NC-v4 SSc3:Open spaceposted by Sophie Brauer on
Hello, I'm trying to assess how much of our project site qualifies as open space.
A shared storm water tank with other projects
CS-2009 SSc6.1:Stormwater design - quantity controlposted by Francesco Allaix on
I have a LEED project where they plan a storm water tank that will be a shared one with two other buildings next to the LEED project building.
Steel lockers BIFMA testing
CI-2009 IEQc4.5:Low-emitting materials - systems furniture and seatingposted by Anna Korinkova on
We have steel lockers on our project which shall be produced by a steel company and painted in the factory. They claim to use low VOC or zero VOC paints.
ASHREA audit though newly renovated
EBOM-2009 EAp1:Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Mathilda Jonsson on
Hello Five years ago my project building were LEED EB:OM certified and now with new tenants and a renovation taken place we are recertifying.
Option 2 IAQ Testing - Schedule
CI-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Anne-Claire BARBERI on
Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.
Cycle network, paths?
NC-v4 LTc6:Bicycle facilitiesposted by Karen Elliott on
Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!