Forum quick links
IEQp1&c2 Documentation
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Jordan Kirrane on
Hello, For my project building the mechanical engineer has provided me with his VAV sizing calculation spreadsheets for all zones and all floors.
Rug
CI-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Alicia Costas Freire on
Hello, I am working on a project where it is proposed to lay a rug directly on top of the raised floor in some areas.
Option 2 - Leadership Extraction Practices - PEFC wood?
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sara Johansson on
Is PEFC wood under Option 2 - Leadership Extraction Practices accepted?
Dual Showerheads
NC-2009 WEp1:Water use reductionposted by Pia Öhrling on
We have a hotel where the showers have two showerheads. One showerhead placed overhead and one han-held showerhead. They have different flow-data.
Very old CI 2009 registered project - can we still certify?
CI-2009 PIf1:Minimum Program Requirementsposted by Eric Thompson on
Hi I'm helping a colleague who has a project that was registered in 2011 for LEED CI 2009 and construction completed / substantial completion in 2011.
Multi-attribute optimization
CS-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Tobias Berge on
Object - LEED v 4 Core & Shell. Sweden. Our goal is Platinum and we find the material credits very challenging.
Transportation Planning Handbook
NC-v4 LTc7:Reduced parking footprintposted by Susannah Goddard on
I don't have a copy of this to hand but need to know the content of Tables 18-2 to 18-4.
Increased ventilation instead of alarms?
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Maria Porter on
I understand that for densely occupied spaces an alarm (visible or audible) is required.
Renewable Energy in CS project
CI-v4 EAc4:Renewable energy productionposted by Sara Johansson on
Is the tenant obliged to install additional renewable energy (or sign ownership/contract for off-site renewable energy) if the CS project fullfills criteria and recieves maximum (3) points?
Peak building users (FTE + Peak Transients)
CS-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Sara Johansson on
I am working on a LEED v.2009 CS project, using deafault occupancy Core and Shell Appendix 1. I assume that FTE and transients here are average transients?