Forum quick links
Occupancy hours vs. Building Operating Plan
EBOM-2009 EAp1:Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Anna Korinkova on
My question is regarding to operating hours of the building and the Building Operating Plan (BOP).
storage of rain water
NC-v4 WEp1:Outdoor water use reductionposted by Francesco Passerini on
Does the storage of rain water contribute to achieve this prerequisite? The project will irrigate the outdoor vegetation only with rain water.
Heat recovery and dehumidification
NC-2009 EAp2:Minimum energy performanceposted by Francesco Passerini on
In a swimming pool removing latent heat is necessary all the year round. For the baseline model, if I model the heat recovery according to G3.1.2.10 Exhaust Air Energy Recovery (50% both sensible a
Simulation. Warehouse. Fixed high racks, occupied.
NC-2009 IEQc8.1:Daylight and views - daylightposted by Candice Clark on
For a warehouse, can I deduct the permanently fixed high racking coverage area from the gross floor area, and focus my 75% daylight coverage on the aisles and landing spaces only? I say yes.
Volume boundary in CFD calculations
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by VICTOR MORENO on
Hi, to perform CFD model for IEQc5-LEED Healthcare. What is the size of the model boundary in exterior CFD calculations? That is to say, What area (m2) around the hospital we have to model?. Than
n/a
Pilot-Credits SSpc55:Bird collision deterrenceposted by Maria Rios on
Hey, We are trying to prepare all documentation to get this credit, and we are having some difficulties due to the next consideration: "Plan(s) and/or elevation(s) depicting the location of all m
LEED v4 rating systems being translated to Portuguese
posted by Tristan Roberts on
USGBC is translating the LEED v4 rating systems to Chinese, Portuguese, and Spanish, and they passed us an advance copy to get your feedback!
Baseline HVAC System Type - for laboratories
NC-v4 EAp2:Minimum energy performanceposted by Carol SR on
Hello! I am constructing a building model which spaces are half offices, half laboratories. The HVAC system chosen is system 5 (packaged VAV with reheat) for all building, since it is considered a
Existing building, physically sepatated from new construction
NC-2009 PIf2:Project Summary Detailsposted by Michela Tedeschi on
We are working on a new constuction in Italy under LEED Certification (NC 2009). An existing building, physically sepatated from the new construction, is located inside the LEED Boundary.
Option 1: Equipment Efficiency
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Ricardo Sá on
Hi, I have several compact rooftop units serving a big sales area. However, only 80% of them is actually new equipment that meet the credit's criteria.