Gravel nonroof area
NC-2009 SSc7.1:Heat island effect - nonroofposted by Charalampos Giannikopoulos on
Under what circumstances could a nonroof area covered with light gravel be considered as non-hardscape?
Soil contaminated (by oil/diesel)
CS-2009 SSc3:Brownfield redevelopmentposted by Julia Otero on
We are working in a project where a tank containing 6,000 lt of fuel has been detected in the soil.
Indoor plants planted in the ground
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Albert Sagrera on
Good afternoon, We are analyzing a building that in addition to having an outside green area and a green roof, will also have plants planted in the ground inside the building, without flowerpots.
EA Credit 2
NC-2009 EAc2:On-site renewable energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..
Additional Enhanced IAQ Strategies
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Marina Curto on
In this credit, two options are available, Options 1 and 2. Can a project achieve Option 2 only without pursuing Option 1?
WEp1 calculator gender
NC-2009 WEp1:Water use reductionposted by VICTOR MORENO on
In v2009 WEp1 calculator, the toilet is divided by gender (male and female. If the % male-female is 50%-50%, it might point to 50% in "percent of occupants" cell each.
Facilities and alterations. Outside the building
EBOM-2009 IEQc1.5:Indoor air quality best management practices - indoor air quality management for facility additions and alterationsposted by Mercè Llorca on
There are outside works planned to be done.
Cooler and freezer storage
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Mercè Llorca on
Hello, We are working on a project that is a combination of offices and food production.
Existing Building Flooring Reuse
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Charalampos Giannikopoulos on
For an existing building under major renovation would the reused flooring be exempt from the credit requirements and should only new flooring to be installed comply with the requirements in order t
Daylight and quality views measurement in a special building
EBOM-v4 EQc5:Daylight and quality viewsposted by Ana Villarroya on
We're working on a case of a building complex that aims to achieve a LEED certification within some years. The complex is a sanctuary, and it includes several hospitality buildings and a shrine.