Reuse of existing building materials in the building parking lot
NC-v4 MRc1:Building life-cycle impact reductionposted by Greenlab on
Hi. In option 3 of this credit “Building and Material Reuse” we must reuse or salvage building materials from off site or on site as a percentage of the surface area.
No Facility Alterations
EBOM-2009 MRc9:Solid waste management - facility alterations and additionsposted by Charalampos Giannikopoulos on
Would a project with no facility alterations or additions during the performance period and as result with no relevant waste be still eligible for this credit?
pursuing thermal confort in a museum/gallery
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Angel Vega on
Our team is pursuing this credit for a museum/art galleries building. I´ve been checking the IAQ matrix and if I am strict, we should forget this credit.
Alarms with CO2 sensors
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Instra Ingenieros on
hi, We have a project with non-densely spaces. The non-densely space will have CO2 sensor. VAV with 100% outdoor air will be supply the OA to these spaces.
Faucet in cleaning room
NC-2009 WEp1:Water use reductionposted by VICTOR MORENO on
Should I include the faucets placed in a cleaning room? It are used for cleaning of the building. Thanks
Aerothermal Energy
NC-v4 EAc5:Renewable energy productionposted by Helena Garcia on
We're designing a system based on renewable energy installation for new construction. A part of this installation would performed by aerotermal energy.
Indoor Water Use Reduction_Well water
CS-v4 WEc2:Indoor water use reductionposted by Giuseppina Amorusi on
Hi everybody, I was envolved in LEED v4 C&S certification. I would know if in Credit Indoor Water Use Reduction it’s possible to consider well water accumulated in water tank as alternative wat
Option 1: Zoning and controls
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Ricardo Sá on
Hi, The project is basically a huge sales area with some office spaces.The sales area is served by multiple compact rooftop units and the office areas are served by DOA´s for ventilation purposes
Lots and open space question
NC-2009 SSc5.2:Site development - maximize open spaceposted by Albert Sagrera on
Hello, We are wondering if a future building occupying two different plots can be considered as a single LEED project or not. In the case that it is considered as a single project, as it affects
Policy goals
EBOM-2009 MRp1:Sustainable purchasing policyposted by Charalampos Giannikopoulos on
Does a specific goal need to be addressed for the policy or would a prescriptive description of the goal be used such as that “the goal is to, at a minimum, maintain the current environmentally pre