Forum quick links
Data Center Energy Performance Calculator
NC-2009 EAp2:Minimum energy performanceposted by Wei Jiang on
Dear all, We are trying to calculate the IT & electricial energy consumption of a data center, using the Minimum Energy Performance Data Center Calculator.
ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
We met a confused case. As it is a major renovation for data center, there is no need for controlling soil erosion, waterway sedimentation for construction.
Energy Star equipment
CI-2009 EAp2:Minimum energy performanceposted by mingyu Zhang on
Hi All: Our project is a little bit special, so i wonder whether we can get the scores of EAp2-4.
unfinished space simulation
NC-2009 EAp2:Minimum energy performanceposted by Hongyun Zhou on
My building has four floors, and 4th flr is left empty for future use.
200 rides per day required for shuttle buses?
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Weidong Luo on
Private shuttles are employed to satisfy SSc4.1 on our project.
PAUs not serve the occupied areas
NC-2009 IEQp1:Minimum indoor air quality performanceposted by study topenergy on
A data center is applying for LEED-NC v2009. There are 5 PAUs (Primary Air Unit). 4 of them will serve the equipment rooms. One will serve the equipement rooms and office areas.
Historic site
CS-v4 LTc3:High priority siteposted by Jie Xiong on
Hi I am new to V4. There is a question about this credit. On the RG, page 75 further explanation, says that "project may......indicates has significant historic or cultural value".
energy-saving target during construction
CS-2009 IDc1:Innovation in designposted by Dee Yun on
Hi, I have a project that has energy-saving target during the construction phase.
Is this items means?
posted by shize zhang on
Is this item means onlly a building certified by ISO 50001 can apply for 1 credit in EA? Then how to apply for ACP? Thanks.
DCV requirement for high-occupancy areas
CS-2009 EAp2:Minimum energy performanceposted by Shenhao Li on
Hello! We have a canteen project in Shanghai. The building has three floors, total GFA is 64,067 square feet. The baseline HVAC system type is system 6.