Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Calculating stored rainwater available

NC-2009 WEc3:Water use reduction
posted by  Yusuf Turab  on 

We are having some trouble coming up with the calculation for rainwater stored and reused annually.

0

Calculating Average Density: Residential Areas or Neighborhood

CI-2009 SSc2:Development density and community connectivity
posted by  Ajay Kumar  on 

For Option 2: Community Connectivity. # Is located within 1/2-mile of a residential area or neighborhood with an average density of 10 units per acre net. Please clarify on how to calculate the a

1
Mon Nov 21, 2016, 2:48 pm

Changed awarded credit to attempted

LEED Rating System Selection
posted by  Prudhvi Mahadev  on 

I have mistakenly checked the credit box to "Attempted" for the credit which was alreadly awarded in LEED onlie portal. how to claim that the credit is already awarded in the final submission?

1
Sat Aug 26, 2017, 7:42 pm

Long Term Service Contract

NC-2009 EAc4:Enhanced refrigerant management
posted by  Erin Holdenried  on 

Does anybody have an example of a long term service contract, or know specifically what needs to be included in the contract in order for it to be accepted by the GBCI reviewer?

0

Green Product- FSC

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  VISHESH AGARWAL  on 

If toilet roll and Hand roll is FSC Certified then it can take count as sustainable product category in the Janitorial paper Product Category.

1
Thu Aug 25, 2016, 2:39 pm

SS - EM

NC-2009 EAc1:Optimize energy performance
posted by  SSN Energy Model  on 

Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.

1
Sun Feb 19, 2017, 5:24 pm

LIFT Lobbies to be included in VRP Calculations

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  Preethi Ranjith  on 

i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.

0

Are changing rooms compulsory now as per revised credit form

CI-2009 SSc3.2:Alternative transportation - bicycle storage and changing rooms
posted by  Priyadarsi Das  on 

In the earlier credit form, we had to enter the total number of showers/ changing rooms in the project.

1
Wed Jan 18, 2017, 2:31 pm

How to get the benefit of automatic shading control device

NC-2009 EAc1:Optimize energy performance
posted by  Yusuf Turab  on 

We are using Visual DOE 4.2 software for energy modeling and we are doing one LEED NC project, the project team is planning to do the automatic sensor control window shading device, and how to take

1
Fri Jul 1, 2016, 2:14 pm

Lighting Control

EBOM-2009 IEQc2.2:Controllability of systems - lighting
posted by  VISHESH AGARWAL  on 

I am working on the project where whole building have occupancy sensor. does need to install 50% of the multi occupant space have lighting control by dimmer.

1
Thu Oct 6, 2016, 4:23 pm