Forum quick links
Acoustic performance
Data-Centers-NC-v4 EQc9:Acoustic performanceposted by neeraj arora on
How to calculate composite STC for a room?
Mandatory requirements
NC-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.
leed ebom- v4: Enhanced indoor air quality strategies
EBOM-2009 IEQc1.2:Indoor air quality best management practices - outdoor air delivery monitoringposted by VISHESH AGARWAL on
Option 2. Additional enhanced IAQ strategies (1 point) Comply with the requirements of at least one of the following. 1. Filtration for mechanically ventilated spaces 2. Carbon Dioxide Monitors 3.
Option-3: Irrigation Meter Installed
EBOM-v4 WEc1:Outdoor water use reductionposted by VISHESH AGARWAL on
i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.
Tenant agreement to exclude PFP boxes
CS-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
In our project location, it is clear that no tenants will go for a heating system. The base building is also designed for cooling only.
LEED Boundary
NC-2009 IEQp1:Minimum indoor air quality performanceposted by ABDUL MUTHALIB MOHAMED on
I am working on LEED boundary for Factory building. The factory has two buildings with common car parking but we are applying LEED certification for only building - 1.
Building Flush out for naturally ventilated building
EBOM-2009 IEQc1.5:Indoor air quality best management practices - indoor air quality management for facility additions and alterationsposted by PRATIK KUMAR on
Under EBOM IEQ-Cr-1.5, i have a building which is naturally ventilated, i am doing painting for the building, how do i meet the flush out procedure.
ACP for India
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Renu Rani on
Is there any ACP available for India?
EBOM V4- IPM
Hospitality-EBOM-v4 EQc9:Integrated pest managementposted by VISHESH AGARWAL on
For Pursing the option-1. In house IPM Policy: is it mandatory to use the SF Tier-III Pesticide or use government approved pesticide.
Changed awarded credit to attempted
posted by Prudhvi Mahadev on
I have mistakenly checked the credit box to "Attempted" for the credit which was alreadly awarded in LEED onlie portal. how to claim that the credit is already awarded in the final submission?