Forum quick links
Forum
Topic
Replies
Recent
International Project - Case 2 Option 1 or Option 2
EBOM-2009 EAc1:Optimize energy efficiency performanceposted by Sheena Moses on
Dear all, The case 2 calculator has pointed us towards using Case 2 - Option 1 for our Existing Retail Mall project located outside of the US.
1
Tue Aug 29, 2017, 6:19 pm
International Project - Case 2 Option 1 or Option 2
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Sheena Moses on
Dear all, We have a retail mall in Malaysia targeting LEED EBOM v2009 rating.
1
Tue Aug 29, 2017, 3:32 pm
HVAC System 8 Baseline
CS-2009 EAp2:Minimum energy performanceposted by CINDY CHAI on
Hi all, Currently I have a project in Malaysia that is going for LEED Core and Shell (2009), the project consists of multiple buildings but will be certified under one certificate.
3
Thu Mar 26, 2015, 12:39 am
Mechanical Ventilation using local code
NC-2009 IEQp1:Minimum indoor air quality performanceposted by MOHD HAFIZI MOHAMAD on
Hi. Is it a compulsory to design mechanical ventilation by using local code even if ASHRAE Standard is more stringent in order to score IEQ Credit 2: Increased Ventilation? I got a problem to sco
5
Thu Jan 22, 2015, 2:37 am