Forum quick links
100% certified wood
NC-2009 IDc1:Innovation in designposted by Abdulla Anwar on
Dears, Our project is aiming for innovation design credit of 100% FSC certified wood, my concern is about does (FSC mixed) certified product contributing to this credit or only the (100% FSC) cert
Baseline EER - System 2 PTHP
NC-2009 EAp2:Minimum energy performanceposted by SSN Energy Model on
As per Table 6.8.1D, I observed the following EER = 12.3-(0.213*Cap/1000) EER Also, Cap means the rated cooling capacity of the product in Btu/hr.
aerosol paints
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Abdulla Anwar on
is there any requirements for aerosol paints?
System 2 - LEED Fan Power ASHRAE 90.1.2007
NC-2009 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hi, Greetings! I am doing Energy Model for Labor Accommodation. I have some doubts and need your help, Baseline system will be system 2 as per ASHRAE 90.1.2007.
smoke leakage test for duct
NC-2009 EAc3:Enhanced commissioningposted by Abdulla Anwar on
Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test? prior to air leakage test since the project specs is giving a small allowable 1% from basis of design?
Mosquitos eradicate substance
NC-2009 SSp1:Construction activity pollution preventionposted by Tota Yun on
How I can know if this substance which already used by the contractor in new construction project comply with LEED DELTABAZ 25 EC
EAp2
NC-2009 EAp2:Minimum energy performanceposted by sherif el adly on
We are working on a huge project in Riyadh, to meet EAp2 we sould look for a water cooled chiller due to the area of the project and the challenge to reach a COP near to 8 to meet the 10% from base
SRI of sand
NC-2009 SSc7.1:Heat island effect - nonroofposted by Karim Farah on
Does anybody know the SRI of natural sand?
Alternative Standard to ASHRAE 90.1-2007 Appendix G
NC-2009 EAp2:Minimum energy performanceposted by Jourdan Younis on
We have a project that consists of two connected buildings: an admin building and a factory building.
EAc5.1 vs EAc5
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Mohammad Haj-Ali on
As I understand having read user comments, although the reference guide emphasizes that electricity is to be measured, other energy sources should also be measured just like M&V for new constru