Forum quick links
LEED Development Density and community connectivity
NC-2009 SSc2:Development density and community connectivityposted by Sherrin Pulickal on
What does it mean by double the project density compared with average density within a calculated area? Its the ememplary performance in option 1.
EAc 5.1 for LEED C&S
CS-2009 EAc5.1:Measurement and verification - base buildingposted by S Nagarajan on
Dear Sir I am involved in a 5-storey building. The base building loads are mixed loads, i.e the loads include lighting and small power.
Duct Seal level
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Sarfaraj Khan on
Minimum duct seal level must comply with table 6.4.4.2A- Ashrae 90, i have this in my specification for duct and i think it apply only to G.I Duct, Not to pre insulated duct, please anyone can clar
Baseline Pumping Power
NC-2009 EAp2:Minimum energy performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.
Applicable Cooling source in Propose case - LEED Group - v4 C&S
CS-2009 EAp2:Minimum energy performanceposted by Ashraf Ali Khan Khan on
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.
School Building
NC-2009 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hi, We are doing the Energy Model for SCHOOL Building. The client has proposed Air cooled chiller.
Temporary Materials - Formwork
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Christopher Drew on
The materials credits apply to components that are permanently installed in the building.
LEED NCv 2009 Multi-Family Residential: Apartment
NC-2009 EAp2:Minimum energy performanceposted by junaid naseer on
Hi All, I have seen this point tackled in many comments earlier but we still have some doubts. We have a residential building of 16 floors which sits on a podium of 3 floors.
Core performance guide option
NC-2009 EAp2:Minimum energy performanceposted by mohammed alshaikhsalama on
Hi, The project intents to follow option 3 Perspective compliance path Advanced Building Core Performance Guide.