Entryway system

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Elodie DUMAS  on 

Our project is an office building where groundfloor is componed by retails and services dedicated to unknown tenants. Taking into account that this is a CS certification, do we need to install ent

4
Senior Sustainability Manager
WSP
LEEDuser Expert
53 thumbs up
Tue Aug 7, 2018, 1:48 pm

WaterSense Labelling Alternatives

CI-v4 WEp1:Indoor water use reduction
posted by  Oliver Bate  on 

Hi! Toilet (Water Closet); Urinals; Private Lavatory Facuet; and Showerheads all need to be WaterSense Labelled. However- what are the equivalent labels?

5
SW Regional Design Resilience Leader
Gensler
LEEDuser Premium Member
15 thumbs up
Fri Jul 20, 2018, 2:38 am

Bicyle Storage in a office building

CS-v4 LTc6:Bicycle facilities
posted by  Guillaume Rose  on 

Hi,

Is the Case 1. commercial or institutional projects applicable for an office building ? 

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
378 thumbs up
Mon May 28, 2018, 9:27 am

Insulation - option 2 budget calculation method

NC-v4 EQc2:Low-emitting materials
posted by  Caroline PIN  on 

Dear all, The guide is not very clear about interior or exterior insulation when we use option 2. Exterior insulation must be included in option 2 calculation for New Construction of offices ?

6
Tue Apr 24, 2018, 10:44 pm

Parking spaces for projects logistics

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Anna Korinkova  on 

Our project is an exhibition center. Do we have to count parking spaces for exhibition logistics (incl. trucks, vans, supply deliveries ets.) into the LEV/FEV calculation? Thanks.

1
Mon Apr 9, 2018, 1:34 pm

90.1 2010: V4: Baseline Lighting Control

NC-v4 EAp2:Minimum energy performance
posted by  Adrien Dumolard  on 

Hello, I work on my first PRM. In the 9.4.1.2 mandatory provisions, the standart say: "The controlled lighting shall have at least one control step between 30% and 70% (inclusive) of full lighting

3
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
13 thumbs up
Wed Apr 4, 2018, 1:31 pm

Staff resources for LEED ND Projects

ND-Plan-v4 MPR2:Must use reasonable LEED boundaries
posted by  Devani PERERA  on 

Hi,

Is it necessary to have a Leed Green Associate or a Leed AP ND to propose one project to the certification LEED ND (plan or built) ?

Thanks for your help.

Regards.

3
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Fri Oct 6, 2017, 9:06 am

Green e energy equivalency EKOenergy

CI-v4 EAc6:Green power and carbon offsets
posted by  Valentin Grimaud  on 

Good afternoon, I'm working for a design building company in France. We aim the LEED certification for a shop project. We try do get 2 points for the Green Power and carbon offset credit.

1
Wed Jan 18, 2017, 4:25 pm

Coffee Room Fixture Flow Rate?

NC-2009 WEp1:Water use reduction
posted by  Ian McCall  on 

Hello, From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.

1
Wed May 13, 2015, 10:19 am

Minimum Energy Performance

NC-v4 EAp2:Minimum energy performance
posted by  Alexandra Mazzoni  on 

Hello, I have a question regarding equivalent standards : Is there an USGBC approved equivalent standard for projects located in France ? Many thanks in advance for your assistance.

1