PROJECTION FACTORS FOR VERTICAL FINS

CS-v4 EAp2:Minimum energy performance
posted by  Fotis Kotsopoulos  on 

Dear all,

Is it possible to correlate vertical fins with projection factors shown in table 5.5.4.4.1 ASHRAE 90.1-2010?

 

FK 

1
Wed Apr 15, 2020, 5:22 pm

ASHRAE Baseline HVAC System

NC-v4 EAp2:Minimum energy performance
posted by  Nikos Tsitsikas  on 

Hi all,

Can I pick someone's brain about which ASHRAE Baseline HVAC system we should be selecting for a Hospitality project we are working on?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Feb 25, 2020, 9:16 am

ASHRAE Baseline HVAC System for Hospitality project

Hospitality-NC-v4 EAp2:Minimum energy performance
posted by  Nikos Tsitsikas  on 

Hi all,

Can I pick someone's brain about which ASHRAE Baseline HVAC system we should be selecting for a Hospitality project we are working on?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Feb 25, 2020, 9:17 am

Terminal of Airport

Credit Forums
posted by  Konstantina Kalliakoudi  on 

Hello,

I have a project  for the rating system LEED BD+C that is the Terminal of an airport. 

I was wondering if USGBC had any special guidelines for airports.

0

Easily Achieved

Pilot-Credits MRpc69:Construction and demolition waste management
posted by  Emmanuel Pauwels  on 

We applied this credit in our Project in Athens in Greece and had no difficulty achieving it.

0

online form SI units not functioning correctly

EBOM-2009 SSc6:Stormwater quantity control
posted by  GEORGE GKLAVAS  on 

When using the same input data in both forms (IP and SI units) someone should expect the same result (percentage mitigated).

0

Existing Building Flooring Reuse

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Charalampos Giannikopoulos  on 

For an existing building under major renovation would the reused flooring be exempt from the credit requirements and should only new flooring to be installed comply with the requirements in order t

1
Thu Feb 12, 2015, 2:05 pm

No Facility Alterations

EBOM-2009 MRc9:Solid waste management - facility alterations and additions
posted by  Charalampos Giannikopoulos  on 

Would a project with no facility alterations or additions during the performance period and as result with no relevant waste be still eligible for this credit?

1