Forum quick links
Building with similar floors and layout: simulation simplifications
NC-v4 EQc7:Daylightposted by Ricardo Sá on
Hi,
Museum additional interior lighting
NC-2009 EAp2:Minimum energy performanceposted by Luis Andrade on
Hello,
Minimum HVAC equipment efficiencies
NC-2009 EAp2:Minimum energy performanceposted by Ricardo Sá on
The project seeking LEED certification includes air-to-water heat pumps (4-pipe), that are able to produce hot and chilled water (simultaneously or separetly).
Recycled cork can contribute to achieve MRc6?
NC-2009 MRc6:Rapidly renewable materialsposted by Ricardo Sá on
We're working in a project that use a thermal coating based on cork material. This cork is 100% recycled. Can this material contribute to achieve both credits (MRc4 +MRc6)?
Option 1: Zoning and controls
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Ricardo Sá on
Hi, The project is basically a huge sales area with some office spaces.The sales area is served by multiple compact rooftop units and the office areas are served by DOA´s for ventilation purposes
Transfer Air for IEQp1 achievement
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
Hello, I'm currently working on a project of a huge supermarket. The building has warehouses and storage rooms.
Building's equipment still uncertain
NC-v4 EAc3:Advanced energy meteringposted by Maria Matos on
Hi Marcus, We are working on a building which will have the following uses: offices, laboratory (pharmaceutical), showers and changing facilities, canteen and a smaller bar.
Determining compliance
NC-2009 SSc6.2:Stormwater design - quality controlposted by Tiago e Silva on
I’m working on a Project in Portugal, which consists in a 13.400m2 site, with 6000m2 rooftop (harvests rain), 2500m2 green roof, 2735m2 of gardens, 306 m2 of planters and 1840m2 of impermeable pave
Baseline HVAC System Type - for laboratories
NC-v4 EAp2:Minimum energy performanceposted by Carol SR on
Hello! I am constructing a building model which spaces are half offices, half laboratories. The HVAC system chosen is system 5 (packaged VAV with reheat) for all building, since it is considered a
Single tenant O&M certification on a multitenant building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
LEED O&M 2009 reference guide stated (page xxii) that "certification applies only to whole buildings" and that "the project of a multitenant building must involve at least 90% of the total gros