Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Easily Achievable Where Mandates are in Place

Pilot-Credits SSpc129:Comprehensive Composting
posted by  Marsha Gentile  on 

This pilot credit is easily achievable where mandates and infrastructure (by municipality and/or base building in case of CI project) are in place.

9
Thu Jul 30, 2026, 6:25 pm

Option 3 flexible lighting control system required documentation

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Alara Brinton  on 

I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.

4
Default Avatar
Senior Engineer, LEED AP
Taitem Engineering
LEEDuser Premium Member
6 thumbs up
Fri Jul 10, 2026, 4:00 pm

Is a TVOC emissions evaluation for an epoxy flooring system's topcoat acceptable?

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Lutfi-Hisham Muhammed  on 

We are managing the new construction of a pharmaceutical production facility where we have an epoxy flooring system to be installed which consists of a primer, application of the main product (prod

0

Legal Wood - Pilot Credit LEEDv4

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Sophie Kerr  on 

If I have SFI products that make up 100% of my wood products, 25+% of my total materials, and have I completed the survey, have I met the pilot credit?

8
Sat Jan 31, 2026, 12:37 am

Any success with this credit yet?

Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysis
posted by  Sophie Kerr  on 

Hello,

I've submitted for this pilot credit but haven't received reviewer comments yet, has anyone received comments, what are they?

Sophie

27
Wed Jan 28, 2026, 8:27 pm
1
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Dec 1, 2025, 7:06 pm
3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Oct 30, 2025, 4:29 pm
7
Default Avatar
LEEDuser Premium Member
19 thumbs up
Thu Oct 23, 2025, 2:43 pm

Lowest flow shower on the market

NC-v4 WEp2:Indoor water use reduction
posted by  Sophie Kerr  on 

What is the lowest flow shower you've come across? The lowest we have is 5.7 LPM (1.5 GPM). 

10
Thu Apr 24, 2025, 5:53 am

VOC limit of Aerosol Adhesives

NC-v4 EQc2:Low-emitting materials
posted by  L W  on 

Hi All,In LEED v4 and 4.1, is there a limit on the VOC content of aerosol adhesives, and if so what is it?

10
Default Avatar
Sustainability Project Engineer
Balfour Beatty US
LEEDuser Basic Member
0 thumbs up
Wed Apr 2, 2025, 9:35 pm