Health and Safety Specialist requirement

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Shanwen Hsu  on 

Do we need to provide Ergonomist/ Health and Safety Specialist's bio or prove of credentials? 

2
Opsis Architecture
LEEDuser Premium Member
14 thumbs up
Mon Nov 15, 2021, 8:58 pm

Exemplary Performance

NC-v4.1 EQc4:Indoor Air Quality Assessment
posted by  Peter Downar  on 

The BD+C v4.1 guide states that "Exemplary performance is available for projects that test for the additional target volatile organic

1
Thu Oct 28, 2021, 4:13 pm

Soil stockpiling over the winter

NC-v4 SSp1:Construction activity pollution prevention
posted by  Scott Beckman  on 

We have a correctional project where we are doing some of the sitework now but the project work will be paused over the winter.

1
Tue Oct 26, 2021, 8:20 pm

Project pertaining to only the third floor of a building

CI-v4 EAc2:Optimize energy performance
posted by  Peter Downar  on 
  1. The project pertains to a fit-up of only the 3rd floor of a multi-floor building.
1
Fri Oct 29, 2021, 5:26 pm

Metering for Fuel Tank

NC-v4 EAp3:Building-level energy metering
posted by  Carolyn Risley  on 

For EAp3 Building-level Energy Metering on a LEED v4 project, does a propane tank need a meter to meet the requirements of this prerequisite?  Would monthly fuel delivery invoices be sufficien

1
Thu Oct 7, 2021, 2:33 pm

Owner Supplied Furniture - non-residential

NC-v4 EQc4:Indoor air quality assessment
posted by  Leanne Conrad  on 

We are approaching the start date of our IAQ assessment and I would like to be 100% sure that I need to include owner supplied furniture in the test.

9
Sustainability Manager and Architect
Pope Design Group
LEEDuser Basic Member
47 thumbs up
Fri Oct 1, 2021, 4:45 am

Demolition of existing building

NC-v4 MRc5:Construction and demolition waste management
posted by  Erik Heck  on 

We have a project which will be built on the site of an existing building. Does the demolition of that existing building need to be included in the MRc5 waste diversion calculations?

4
Perkins Eastman
LEEDuser Premium Member
0 thumbs up
Mon Sep 27, 2021, 9:19 pm

Distinct Structures - Pump House

Schools-NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Kathryn Haeberle  on 

We are building a replacement elementary school on an existing school site.  The school will get water from new wells we are installing that require a separate 'pump house'.  This pump ho

0