Option 2 Budget Calculation - Mechancial Adhesives and Sealants
CI-v4 EQc2:Low-emitting materialsposted by Gina Rahmann on
If pursuing the budget calculation method, how do you capture the layer surface area for mechanical products such as duct sealants, pipe sealants, firestop, etc.
Option 2. Third-Party Utility Reporting (1 point)
Homes-v4 EAc5:HVAC Start-up credentialingposted by Robert Grimard on
Hi,
I'll soon be the proud owner of a small house in Quebec, Canada and I need clarification on this Option 2 of th Advanced utility tracking. It says:
CC&R
ND-Plan-v4 GIBc17:Light pollution reductionposted by William Gagnon on
Hello, Any examples of CC&Rs relative to light pollution reduction?
At the discretion of the permit holder
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Ashley Hu on
Hi Everyone, here's another question. The campus guidance from the LEED Canada Reference Guide states the following: " It is acceptable to achieve a Campus Shared Infrastructure compliance path
LEED V4 DATA CENTER
NC-2009 PIf1:Minimum Program Requirementsposted by Caroline Vallieres on
There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.
Adding carpet to LEED Platinum NC building
posted by Alireza Anvari on
Hi, I'm new here and new in LEED, I apologize for my ignorance. I work as a PM in a LEED Platinum NC building. We are planning to install carpet in the top floor hall way.
EQc5 - Parking Garages
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Kristopher Lashley on
We have a multi story underground parking structure that is exhausted with 26,000cfm P1, 32,000 cfm for P2 and P3.
retail definition?
ND-Plan-v4 SLLc4:Bicycle facilitiesposted by Ian Scott on
I am curious what uses "retail" would include. Have searched for a definition but can't find one.
RE: Vanpool Parking for a Core and Shell
CS-2009 SSc4.4:Alternative transportation - parking capacityposted by Troy Glasner on
Hello, I am working on a C&S project. The minimum parking capacity set by local zoning is 165 parking spots. The project has 165 spots exactly. The project size is 86000 sq ft.
Previously Developed Buildings exemption
Homes-v4 LTp1:Floodplain avoidanceposted by Joanne Sawatzky on
What is meant by 'previously developed buildings'? We have a project where there are existing residential buildings on a site that will be demolished for new residential buildings.