Forum quick links
RE: Vanpool Parking for a Core and Shell
CS-2009 SSc4.4:Alternative transportation - parking capacityposted by Troy Glasner on
Hello, I am working on a C&S project. The minimum parking capacity set by local zoning is 165 parking spots. The project has 165 spots exactly. The project size is 86000 sq ft.
Previously Developed Buildings exemption
Homes-v4 LTp1:Floodplain avoidanceposted by Joanne Sawatzky on
What is meant by 'previously developed buildings'? We have a project where there are existing residential buildings on a site that will be demolished for new residential buildings.
Does Revit daylight analysis satisfy CaGBC for IEQc8.1
NC-2009 IEQc8.1:Daylight and views - daylightposted by ben chouinard on
Can anyone confirm if the in-house plugin for Revit 2015 will be accepted for IEQc8.1 simulation?
Sub-merters
EBOM-v4 EAp2:Minimum energy performanceposted by Ann-Judith Belanger on
Hi, we have a building that share some mechanical equipment with the adjacent building.
Successful CIR: Audio Tours as Green Education (Canada)
NC-2009 IDc1:Innovation in designposted by Jackie Kanyuk on
We've received a successful CIR ruling on our Green Education Audio Tour package, which is a slide show with audio (recorded on site), and an online case study.
LEED O+M: Multifamily
NC-v4 MPR3:Must comply with project size requirementsposted by Adam Stoker on
Where can I go to find information on the project size requirements for LEED O+M: Multifamily projects?
Customer Use of Restrooms
Retail-CI-v4 WEc1:Indoor water use reductionposted by Mélanie Pitre on
Working on a retail project, we have the same case as described by Donny Goris Kolb in his comment : the store's restrooms are intended for employee use, but employees are directed to grant custome
Empty parking spots
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by S. Macgregor on
We are installing alternative-fuel refueling stations, with preferred parking.
Requirements for recycle concrete
NC-2009 MRc4:Recycled contentposted by Dw Barnes on
Is there a certain requirement/specification to use concrete that has been crushed from other sites as a material for another site?
FTE calculation and use associated for visitors
Healthcare-v2009 WEp1:Water use reductionposted by Annabelle Lam on
I am working on a hospital project where I have both inpatients and visitors.