Forum quick links
LEED V4 Canada, paint Questions
posted by Francois Bellefleur on
Good morning, first time here, with the new LEED v4 in Canada I have a few questions about the paint for new construction. Does the regional distance of 800KM still in place in LEED V4 ? Does the V
Storm dry pond onsite overflows to stormceptor
posted by Marie-France Duthilleul on
Pre condition - open field and grass, a few trees. Post Condition: Development of a large military type vechicle building with loading docks and paved circulation drive area.
Water-Related Systems Implementation Phase
CS-v4 IPc1:Integrative processposted by Tyler Young on
I love the introduction of this credit. I have a question regarding the implementation phase of the water-related systems.
On site + Off-site restoration
ND-Plan-v4 SLLc8:Restoration of habitat or wetlands and water bodiesposted by Guillaume Martel on
Our project is redevelopping a contaminated site (whole city block), which is part of a larger urban area belonging to the same owner.
Determining STC ratings for ceiling products
NC-v4 EQc9:Acoustic performanceposted by Adam Stoker on
The LEED v4 acoustics credit addresses sound isolation purely through composite STC ratings. In my research, I have struggled to find STC ratings for ceiling products.
residents of Multi-residential project
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Yan-Chuan Chen on
Hi All, I am working on a multi-residential building. However, the residents number should put based on the LEED Ref. Guide or on building code?
Number of bus stops and bus lines required
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Sarah Lavalliere on
There seem to be a slight difference in the wording between the English version of the LEED 2009 CS Canada reference guide and its French translation.
FAR for parks with pavillion
NC-v4 SSc3:Open spaceposted by nancy picard on
I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?
Heated Bus Storage
NC-v4 EAc2:Optimize energy performanceposted by Victoria Watson on
Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.
Lease requirements for this credit
CS-2009 IEQc2:Increased ventilationposted by Troy Glasner on
Hi, I am just wondering what specific lease requirement language would be needed for this credit.