Forum quick links
How to tell if the chemical inventory of a product is disclosed to 0.1% (1000ppm)
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
Hello there,
Option 1 accepts the following as documentation:
Public park adjacent to the project boundary
NC-v4.1 SSc3:Open Spaceposted by Eslam Elshorbagy on
Hello,
Strategy 7. Operable Windows - ASHRAE 62.1-2016 for windows location
NC-v4.1 EQc1:Enhanced Indoor Air Quality Strategiesposted by MAUDE PINTAL on
Hello
LEED certification for open spaces
posted by Sergio Acevedo on
We would like our expansion project to be LEED certified.
There will be no physical separation between the existing building and the extension (no walls).
How can a warehouse extension project (with no regularly occupied space) comply with EQp1?
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Blake Jackson on
I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing.
Regularly used exterior entrances
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Julie Hardy on
Hello,
CO2 monitoring for Core and Shell projects
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Irene Chung on
Hi, Is a copy of the lease agreement stating that tenants must install co2 sensors in all densely occupied spaces required for v4 Core and Shell projects?
Contaminated material in a bulldozer demolition
NC-v4 MRp2:Construction and demolition waste management planningposted by Priscillia Champagne on
Hi LeedUser,
Interior Renovations to Historic Building while maintaining historic status
NC-v4 MRc1:Building life-cycle impact reductionposted by Dimuth Kurukulaarachchi on
Would a project still qualify for Option 1 Historic Building Reuse if it has a local historic designation (requiring maintenance of the building exterior components)? Th
Systems requiring metering
CS-v4 EAc3:Advanced energy meteringposted by Tim Nabholz on
Hi All, I am pursuing this credit for a LEED v4 Core and Shell project and am having trouble determining which systems require meters.