Forum quick links
Non-occupied Garage - Flush required?
NC-v4 EQc4:Indoor air quality assessmentposted by Leanne Conrad on
If we have a separaetly HVAC served storage garage that is quite large and mimininally heated, does this area have to be included in the whole building flush and maintain the higher than normal tem
Advanced Metering NC Space Exemptions
NC-v4 EAc3:Advanced energy meteringposted by Alexandra Markus on
I'm working on a recreation center project that includes a daycare. The daycare space will not be fit-out as part of the project.
Flooring Weld Rods: Document in which category?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Jason Packer on
Hello Leedusers,
No smoking signage without words
NC-v4 EQp2:Environmental tobacco smoke controlposted by Heather Belsey on
I'm working on a healthcare project where the client is planning on using just the no smoking symbol on the door with no words or 'language' attached. Just the cigarette crossed out - Is this
Bike storage for a hospital - regular building occupants count
Healthcare-v4 LTc6:Bicycle facilitiesposted by Carla Rincon on
Hello,
Greenhouse - SRI Value
NC-v4 SSc5:Heat island reductionposted by Irene Chung on
Can a greenhouse be excluded when doing credit calculation? If not, is there a default SRI that we can use for greenhouse roofs?
Biophilic design plan
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Priscillia Champagne on
I understand that the final result must be that the project implements five distinct design strategies.
Total Roof Area vs. Total Applicable Roof Area
CS-v4 SSc5:Heat island reductionposted by James Jin on
Hi all,
BeCx - Ongoing commissioning plan
NC-v4.1 EAc1:Enhanced Commissioningposted by Manuelle Croft on
The commissioning authority must complete Enhance Cx tasks for the building(s)'s thermal envelope. An ongoing commissioning plan must be developped.