Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Use of ERV for Janitorial Exhaust

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Carolyn Risley  on 

Knowing that in ERVs a small amount of exhaust air seeps/leaks into the supply air stream, is it possible to use an ERV to exhaust air for janitor closets, etc.

0
2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Fri Sep 16, 2022, 5:08 pm

FAR Calculation

NC-v4 SSc4:Rainwater management
posted by  Kene Akunne  on 

Please can someone explain how to calculate residential FAR?

0

Water test location

EBOM-v4 WEc3:Cooling tower water use
posted by  Clive Lacey  on 

Water test for Cooling tower should be done on site?

0

Lighting tab - unconditioned spaces

NC-v4 EAp2:Minimum energy performance
posted by  Paul Caicedo  on 

Hello,

I am using DesignBuilder to export the minimum energy performance calculator spreadsheet; unconditioned spaces are not filled in the Tab Lighting.

1
Wed Aug 24, 2022, 11:02 pm

Does recessed lighting under a canopy have to be accounted for in SSc6?

CS-v4 SSc6:Light pollution reduction
posted by  Wen Zhang  on 

We are working on a project where recessed pot lights are installled under a canopy.

1
Fri Aug 19, 2022, 2:09 pm
5
Sustainable Design Leader
HKS
LEEDuser Basic Member
3 thumbs up
Wed Aug 10, 2022, 4:34 pm

Building Flush-Out Inquiry

NC-v4.1 EQc4:Indoor Air Quality Assessment
posted by  Bolaji Olanrewaju  on 

I am currently working on a LEEDv4.1 NC Office project that is looking to conduct a flush-out pre-occupancy. Would we need to perform the flush-out duration per each zone (e.g.

0

Greenhouse - Regularly Occupied?

NC-v4 EQc5:Thermal comfort
posted by  Irene Chung  on 

I am working on a new university building project pursuing LEED v4 BD+C New Construction, and it includes a greenhouse.

1
Fri Jul 29, 2022, 1:15 pm