Forum quick links
SSpc41 Walkable Project Site
NC-v4 INc1:Innovationposted by Helene Lefkowitz on
Our project team pursued this pilot credit and found it to be very achievable for projects in urban settings.
LEED v4 CI EAb Opt. Energy Perf. : Option 2 : AEDG Maximum Project Size requirements
CI-v4 EAc2:Optimize energy performanceposted by Kristen Callori on
Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant.
"Meeting but not Exceeding Local Zoning requirements" and Building Type based on local zoning
CS-2009 SSc4.4:Alternative transportation - parking capacityposted by Edgar Arevalo on
1) I have been carefully looking over the description for achieving this credit under Case, Option 1, and what I find confusing is how it says in the handbook, "Size parking capacity must meet but
1 EV charging station for 2 spaces and Vehicle Fueling Capacity per Station
CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Edgar Arevalo on
I was informed that the LEED project in question has 1 charging station and two reserved parking spots. Am I to assume that this station has two charging cables, one for each spot, or should
EQpc44
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Lou Niles II on
We pursued this pilot credit on one of our interior projects and did well with only one set of comments.
Excel spreadsheets
NC-2009 MRc4:Recycled contentposted by Brian Harris on
How does one "Unprotect" protected cells in the Materials and Resources Calculator and Low-Emitting Materials Calculator excel spreadsheets provided through LEEDonline?
Water splashing into my freezer with no ice maker.
posted by GeorgeMendes GeorgeMendes on
My ice maker was not making ice. Despite turning it off, water still flowed into my freezer causing a mess.