Forum quick links
Points for being in a LEED certified base building
CI-v4 MPR1:Must be in a permanent location on existing landposted by Dee Spiro on
Hi all - I seem to remember seeing something recently about LEED v4 (or v4.1) ID+C projects again being eligible for points for locating in a LEED certified base building (harkening back to the day
Modeling Microturbines in EnergyPro
NC-v4 EAc2:Optimize energy performanceposted by Joel Embury on
I'm working on a 5 story hotel in San Jose, Ca. The project is considering adding Microturbines. Has anyone modeled these in EnergyPro? If so, are they modeled in a similar manner
DOAS & VRF for LEED in EnergyPro
NC-v4 EAc2:Optimize energy performanceposted by Joel Embury on
I’ve been working on a LEED project with VRF & DOAS in San Jose, CA. For the LEED Energy Model, EnergySoft suggested attaching the DOAS to 10 sq. ft.
Area Weighted Average: White Roof, Green Roof, Sloped Roof with Metal Panel and Bulkhead
NC-2009 EAp2:Minimum energy performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
How to achieve controllability for an arena
NC-v4 EQc5:Thermal comfortposted by Helene Lefkowitz on
Hello - The project I am working on will have an arena and auction hall in the building. It is my understanding these spaces are considered a shared multioccupant space per LEED.
Portion of gound level paving under building
NC-v4 SSc5:Heat island reductionposted by Tilly Ford on
Hi,
I have a building for which the ground level steps back and therefore the paving is shading by the building itself. I can't quite tell how to account for this, is it either:
Water Meter Calibration Timeline
EBOM-2009 WEc1:Water performance measurementposted by Michelle Bracewell-Musson on
Hello All,
Discounted Parking Rate - How to implement?
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Michelle Bombeck on
I have a large mixed use retail/office project that is interested in using the discounted parking rate option to comply with this credit but is finding logistical issues.
ID+C or BD+C for tenant finish project?
posted by Josie Plaut on
We're getting started on a 14,000 SF tenant finish project within a 21,000 SF building.