Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

On-site or off-site separation

Homes-v4 MRc3:Construction waste management
posted by  Amrit Kaur  on 

The credit general requirement requires a percentage of material recycled, and a formal report indicating how much was recycled and to what purpose.

2
Senior Director
Linnean Solutions
LEEDuser Expert
2 thumbs up
Tue Jan 22, 2019, 6:27 am

Option 2 - Excluding Demo

NC-v4 MRc5:Construction and demolition waste management
posted by  Nathan Gauthier  on 

The credit language says "do not generate more than 2.5 pounds of construction waste..." but the example Equation 2 shows "Total construction AND DEMOLITION waste generated..." Has anybody clarifie

17
Default Avatar
Mission Green Buildings
LEEDuser Basic Member
0 thumbs up
Mon Jan 21, 2019, 10:25 pm

How does EPA Method 24 compare to CDPH Standard Method v1.1-2010?

NC-v4 EQc2:Low-emitting materials
posted by  Summer Gorder  on 

We finally found a Static Control Epoxy Coating for a concrete floor that meets the VOC requirement, although it only References EPA Method 24.

1
Fri Jan 18, 2019, 9:21 pm

Budget Calculation Method - can Option 1 be used for the other categories where all products are compliant

NC-v4 EQc2:Low-emitting materials
posted by  Summer Gorder  on 

I have never had to utilize the Budget Calculation Method for compliance using my GBIM verification system, but have one category that may not comply for a large public project pursuing LEED Platin

0
2
Certification Team Lead
Green Business Certification Inc. (GBCI)
LEEDuser Premium Member
11 thumbs up
Thu Jan 17, 2019, 5:18 pm
3
Sustainable Design Lead
CannonDesign
LEEDuser Expert
378 thumbs up
Thu Jan 17, 2019, 4:38 pm

Surface reflectance of materials and Interior shades and Blinds

NC-v4 EQc7:Daylight
posted by  Kavita Karmarkar  on 

1. Where can I find the surface reflectance values for some common materials like gypsum boards, ACT ceilings etc. I can't seem to find it listed in the product documents from manufacturers.

7
Global Technology Leader of Building Performance
Jacobs
LEEDuser Premium Member
3 thumbs up
Thu Jan 17, 2019, 1:08 am

Homes v4, EA, Home Size, positive and negative points?

Homes-v4 EAp4:Home size
posted by  Gary Wheeler  on 

On the Excel spreadsheet from LEED, there is no space to put either positive or netative points.

5
Default Avatar
Arch., LEED AP
LEEDuser Basic Member
0 thumbs up
Wed Jan 16, 2019, 10:42 pm

Commercial Kitchen equipment commissioning

EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysis
posted by  Patrick Cellie  on 

I am working with a convention center currently certified Silver in the v2009 EBOM rating system. The owners are monitoring data with the goal to re-certify when the time comes.

3
Default Avatar
Sustainability Consultant
AECOM
LEEDuser Basic Member
0 thumbs up
Wed Jan 16, 2019, 4:09 pm

Enhanced IAQ - EP for 2 strategies under Option 2?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Teresa Stern  on 

We are looking at installing CO2 monitoring at densely occupied spaces. We are also providing a dust collection system monitor and audible alarm at the firing range in a police station.

1
Tue Jan 15, 2019, 11:13 pm