Forum quick links
On-site or off-site separation
Homes-v4 MRc3:Construction waste managementposted by Amrit Kaur on
The credit general requirement requires a percentage of material recycled, and a formal report indicating how much was recycled and to what purpose.
Option 2 - Excluding Demo
NC-v4 MRc5:Construction and demolition waste managementposted by Nathan Gauthier on
The credit language says "do not generate more than 2.5 pounds of construction waste..." but the example Equation 2 shows "Total construction AND DEMOLITION waste generated..." Has anybody clarifie
How does EPA Method 24 compare to CDPH Standard Method v1.1-2010?
NC-v4 EQc2:Low-emitting materialsposted by Summer Gorder on
We finally found a Static Control Epoxy Coating for a concrete floor that meets the VOC requirement, although it only References EPA Method 24.
Budget Calculation Method - can Option 1 be used for the other categories where all products are compliant
NC-v4 EQc2:Low-emitting materialsposted by Summer Gorder on
I have never had to utilize the Budget Calculation Method for compliance using my GBIM verification system, but have one category that may not comply for a large public project pursuing LEED Platin
LEED V4 Homes Total Reduction Calcukator
Homes-v4 WEc1:Total water useposted by Michael Glincman on
Hello All,
Surface reflectance of materials and Interior shades and Blinds
NC-v4 EQc7:Daylightposted by Kavita Karmarkar on
1. Where can I find the surface reflectance values for some common materials like gypsum boards, ACT ceilings etc. I can't seem to find it listed in the product documents from manufacturers.
Homes v4, EA, Home Size, positive and negative points?
Homes-v4 EAp4:Home sizeposted by Gary Wheeler on
On the Excel spreadsheet from LEED, there is no space to put either positive or netative points.
Commercial Kitchen equipment commissioning
EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysisposted by Patrick Cellie on
I am working with a convention center currently certified Silver in the v2009 EBOM rating system. The owners are monitoring data with the goal to re-certify when the time comes.
Enhanced IAQ - EP for 2 strategies under Option 2?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Teresa Stern on
We are looking at installing CO2 monitoring at densely occupied spaces. We are also providing a dust collection system monitor and audible alarm at the firing range in a police station.