NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Edgar Arevalo on
I'm looking at a submittal that has a material that is to be used on interior and exterior metals of the building construction. Since the adhesive is used for both, can I still account for th
Percentage Range
CS-2009 MRc4:Recycled contentposted by Edgar Arevalo on
This is a bit bothersome. I received 2 submittals where the postconsumer and/or preconsumer range where added as percentage range like "11% to 18%" rather than a fixed percentage value.&
Exam Room Space Definition
NC-v4 EQc6:Interior lightingposted by Summer Gorder on
Our project has a series of exam rooms that we classified as individual, since it is for a particular task with one staff and on additional person.
For Composite Wood- is CDPH the same as CARB?
CI-v4 EQc2:Low-emitting materialsposted by Amanda Lehman Garvey on
I'm looking at a composite wood product by Formica that has Greenguard Gold certification. Is this sufficient to meet the composite wood requirements?
Exterior lighting
NC-v4 EAp2:Minimum energy performanceposted by Santiago Sánchez Sánchez on
Hello,
I am currently working on a residential project looking for certification under LEED V4.
Bikeshare Programs
NC-v4 LTc6:Bicycle facilitiesposted by Allison Wilson on
Has anyone had experience in a LEEDv4 project using bikeshare networks as a way to reduce the number of bicycle storage spaces that must be incorporated within a project?
Heat Island credit much easier?
NC-v4 SSc5:Heat island reductionposted by Elizabeth Powers on
Is anyone else finding this combined heat island credit much easier to get than expected? Given that the thresholds were raised for non-roof paving SR, I understood that additives to lighten
Entire building vs. parts of the building within scope of work
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
In NYC, there is building that the clients are looking to see if it complies with undergoing LEED certification under a Local Law. They pretty much ask for what could be included in the scope
Main Street Program as a Priority Designation
NC-v4 LTc3:High priority siteposted by Teresa Stern on
Our project is located 2 blocks from the nearest historic district, but is within the Downtown area encompassed by the local Main Street Program.
LEED Project Boundary on Contract Documents
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Mark Zoeteman on
Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building.