Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Option 4 - whole building life cycle assessment

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Chloe Naese  on 

Hello, could this credit be pursued for a major renovation of a building, or does it only apply to new construction? Thanks!

3
Senior Sustainability Consultant
Steven Winter Associates
LEEDuser Premium Member
10 thumbs up
Tue Oct 2, 2018, 1:11 pm

Shuttle between building and secured site entrances

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  J Douglas Dietrich  on 

Distance from LEED building to public transit stops is too far to meet requirements, however distance from the guardhouse gate controlling access to the secured site on which the LEED building is l

4
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Fri Sep 28, 2018, 10:48 am

Regional material distance calculation method

CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Lawrence Rennell  on 

According to LEED 2009, there were alternate distance calculations available that applied to products shipped by rail or ship.

0

No issues

Pilot-Credits EApc111:Alternative Performance Rating Method
posted by  Maureen Mahle  on 

I haven't found any major issue for this credit using this PC.

0

Lighting Power Allowance in Landmarked Building

CI-v4 EAp2:Minimum energy performance
posted by  Nita Christopher  on 

We are attempting to certify a small tenant fit out (7,000sf) in a recently awarded LEED v4 EBOM Gold building with Landmark status.

1
Wed Sep 19, 2018, 2:25 pm

Carpet Tile as an Entryway System

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  James Keohane  on 

The Reference Guide for EQc1, Option 1- Entryway Systems describes entryway system in part ..…...

1
Thu Oct 18, 2018, 1:08 am

LEED User Concrete Tracking Form

NC-2009 MRc4:Recycled content
posted by  Melanie Blacklock  on 

Trying to use the LEED User Concrete Tracking Form for the first time to track fly ash. My question concerns Item I: Distances from both harvesting AND manufacturing point to project site (miles).

0

How to calculated for hybrid urinals

CI-2009 WEc1:Water use reduction
posted by  Susan Di Giulio  on 

Sloan has a new "hybrid" urinal that is basically waterless but does a pre-programmed, 1 gallon system flush every 72 hours. This solves a lot of maintenance and odor problems.

4
Sustainable Design Lead
CannonDesign
LEEDuser Expert
378 thumbs up
Fri Sep 14, 2018, 1:52 am