Forum quick links
Exceptional calculation in newer credit templates for v3 (2009)
NC-2009 EAp2:Minimum energy performanceposted by Jill Kurtz on
The exceptional calculations used to be entered into the LEED template but with the streamlined templates, the tables are no longer included in the form.
Bar Space
CI-v4 EQc9:Acoustic performanceposted by Kevin Gilleran on
Hi. We are working on a TI within a shell building which will have a bar, seating, lounge area, kitchen prep areas with support spaces and its own restrooms. No office function etc.
Flush out option -1 for spaces like Stairwells and Elevator shafts
NC-v4 EQc4:Indoor air quality assessmentposted by Nishank Shah on
According to the language used in this credit, we are supposed to perform a building flush-out of the gross floor area.
v4, IDC, LEED Interpretation ID# 10419, 2013 Title 24 Part 6 California Energy Code - Existing envelope?
CI-v4 EAp2:Minimum energy performanceposted by Kevin Gilleran on
Hi,
Option 1 energy simulation - I am in review of the LEED Interpretation ID# 10419 and I am unclear how I model the existing envelope of a ID+C tenant space.
Other Legally Binding Documents to address Local Code in Tenant Spaces
CS-v4 EAc2:Optimize energy performanceposted by Teresa Stern on
Hi, I'm working on a CS project in WA state, which has an energy code more stringent than the ASHRAE baseline.
LEED Construction Submittals
posted by Kevin Doyle on
I have a Construction Submission question. Some Construction Submission credits require verification documentation.
Precipitation information
NC-v4 SSc4:Rainwater managementposted by Carmen Soraya Agudelo on
Hi,
I am not able to find the 10 years or more precipitation for a site in Alabama.
Can somebody has the NOAA link where I can get these precipitation data?
Walk-off Mat Needed at Service or Loading Dock Entries?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Harry Flamm on
Is it required by your experience with LEED v4, that a building's back-of-house Service Entry or Loading Dock Entry to the building be outfitted with a walk-off mat? A LEED reviewer may
Simple Box energy model requirements
CI-v4 IPc1:Integrative processposted by Deborah Stadler on
What exactly is required to be submitted for documentation for the simple box model? We see the worksheet and narrative listed as required documentation for this credit. There is so muc