Forum quick links
Credit 6.11: Support Local Economy
posted by Cindy Quinn on
I am working on a project, evaluating the feasibility of this credit and have questions regarding definitions:
View Type 3 for Private Office Space
NC-v4 EQc8:Quality viewsposted by Edgar Arevalo on
Since View Type 3 entails unobstructed views located WITHIN the distance of three times the head height of the vision glazing, can private office spaces also apply for that view type if the distanc
Tenant Lease Agreement - Required for Credit
CS-2009 EAp3:Fundamental refrigerant managementposted by Lee Han on
I'm currently working on this credit, tenant work is definitely anticipated for future work. The building owner usually don't deal with lease agreements.
LEED Energy Modeling - Credits EAp2 and EAc1
NC-2009 EAc1:Optimize energy performanceposted by Andrew Buck on
We are working on a Hotel project in Chicago, Illinois (USA) with LEED NC v2009. Is my understanding correct in that for credit EAp2 you can follow LEED v.4, and for EAc1 you can follow
New LEED CS v4 project adjaent to LEED ND project
CS-v4 LTc1:LEED for Neighborhood Development locationposted by Susan Di Giulio on
We are working on a LEED-CS v4 project which is adjacent to (across the street from) a LEED-ND pilot project certified site by the same owner.
Which Rating System Applies to a small Addition to In-Patient Hospital ?
posted by Margaret Montgomery on
We're beginning a project that includes a 7500 sf ED addition to an existing Emergency Department that will undergo remodeling. The project is part of a recently constructed but not
Private Entity Recieving Asphault Waste
NC-2009 MRc2:Construction waste managementposted by Brian Harris on
Hi,
Specs for approved roll out mat that is less than 10'-0" in length
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Victor Caban-Diaz on
Does anybody have specs for an approved roll out mat that is less than 10'-0" in length that can be used for this credit?
expected volume
NC-2009 MRp1:Storage and collection of recyclablesposted by Richardson Jean-Baptiste on
Hello all How would one know the expected volume for a building, as well as the frequency of collection for a new project? Can one reference a similar building (similar in s.f.
Preliminary and Final Design Review Submission - Online Steps for Final Design Review
posted by Stephen Sgro on
We received our preliminary design review report. All credits that were pending and ones requiring revisions have been revised and additional documents have been uploaded.