Forum quick links
Non roof measures
NC-v4 SSc5:Heat island reductionposted by Nithya Madan on
Is using mulch considered as a non roof measure under the heat island reduction category?
CARB ATCM and TSCA Title VI Test Results used for IEQc4.4?
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Melanie Blacklock on
My subcontractor has submitted a Test Report showing the MDF has passed the following:
Energy savings from Battery Storage
NC-2009 EAp2:Minimum energy performanceposted by Vinay Shekar on
Hello,
Option 2 HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Aaron Wintersmith on
The credit language for this Option says "provide a separate control zone for each solar exposure and interior space."
Hotel mix use
NC-v4 EAp2:Minimum energy performanceposted by jefferson thomas on
We have a hotel with 4,000 SF of retail at the lower level of a new construction hotel project? How do we sepperate the two projects if they have a central energy plan for chilled water?
Exclusions from Regularly Occupied Spaces for Lab Spaces
CS-v4 EQc4:Daylightposted by Jordan Daniels on
I was wondering if someone can help here. Working on a v4 C&S 5 story building. Some of the tenant space on each floor is laboratory space (40% approximately of each floor).
Eco-Friendly worksafe solvents
posted by Robert Marsh on
Removing dust, dirt, allergens, and infection-causing agents like viruses is a key component of a healthy indoor environment and doing it in a Eco-friendly way is best of all the techniques.
Oops - broken chain of custody wood classification?
Pilot-Credits MRpc102:Legal Woodposted by Joanna Switzer on
Discovered in a project a little too late that FSC doors are being procured /handled by a non-FSC U.S.
Project registration
NC-v4 MPR1:Must be in a permanent location on existing landposted by Kavita Karmarkar on
I am posting this here as this question is not really applicable to any credits / MPR.
Is there a hard cut-off to when a project can register for LEEDv4 New Construction?
Possible innovation point / contact USGBC
NC-v4 INc1:Innovationposted by Kavita Karmarkar on
Hello all,