Forum quick links
How to fill out the Credit form for IEQc1 for a 100% outdoor air system that does not require OA monitoring?
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Nishank Shah on
I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.
How to fill out the Credit form for IEQc5 for a 100% outdoor air system that does not require OA monitoring?
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Nishank Shah on
I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.
General Emissions Evaluation for installation products
Schools-EBOM-v4 EQc1:Indoor air quality management programposted by Sara Axon on
For installation of millwork, our installer uses basic items: liquid nail, wood glue, silicone, spackle, etc.
Locker Rooms as Changing facilities
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Ryan Christensen on
As I fill out the SSc4.2 credit form, I am having trouble reconciling my project into the changing facility vs. shower categories. The project has two large locker rooms with 100+ lockers.
BPDO Calculator
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Christina Nontanovan on
Hello,
Book stack areas as non-regularly occupied?
NC-v4 EQc7:Daylightposted by Kavita Karmarkar on
Hi all,
SSp2 Environmental Site Assessment
Schools-NC-v4 SSp2:Environmental site assessmentposted by Karly Michalowski on
I have a LEEDv4 for Schools project but is focusing on the interior restoration of the building and not site. Is Phase I ESA required for just interior restoration of the building?
Roof deck entry mats?
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Erica Downs on
There have been a lot of earlier threads on this, but they are old and there does not seem to a definitive answer provided yet.
Not eligible if no non-potable water?
CI-v4 IPc1:Integrative processposted by emily reese moody on
It appears that a project may not be eligible for the 1 point associated with the Water Related System if their building(s) do not offer non-potable water sources. Is this correct?
Percent of Occupants
NC-v4 WEp2:Indoor water use reductionposted by Amy Ruffino on
On the Reduction Calculation spreadsheet, how should the "Percent of Occupants" be filled out for kitchen sinks or urinals?