Lack of Sunday bus service
NC-v4 LTc5:Access to quality transitposted by Karen Joslin on
I believe the intent of the emphasis on some level of weekend service means both Sat and Sun. If there are 0 trips on Sunday we cannot average with the high number of Sat trips can we?
Base Building certifcation in progress
CI-2009 PIf5:Previously LEED Certified Detailsposted by Gail Napell on
we have a v2009 project in a base building that's in process for LEEDv2009 EBOM certification. We're ready to submit the design credits for review, but the landlord doesn't expect to have the
Credit Review
CS-v4 INc2:LEED Accredited Professionalposted by Luis Fretes on
Can we submit construction credits for review during design?
Off-Site Parking
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Jeannie Rueter on
I'm working on a major remodel for a city-owned conference center that has no on-site parking. There is a city-owned parking garage near by. The conference center has 25 employees.
University Campus Project
NC-v4 LTc5:Access to quality transitposted by Michele Helou on
We have a university academic building with a weekday schedule M-F.
Weekday met, but no weekend service. Partial points?
CI-v4 LTc3:Access to quality transitposted by Matt Nicholson on
The bus service near our project clearly meets the weekday requirements, but there is no bus service on the weekends in Salem, OR.
Exterior composite wood covered?
NC-v4 EQc2:Low-emitting materialsposted by Craig Graber on
For non-HC or School projects, does this credit cover EXTERIOR composite wood? Credit requirements and Ref.
Pneumatic Controls - Monitoring Based Cx
CI-v4 EAc1:Enhanced commissioningposted by Christopher Lim on
I am currently working on a TI project for two floors of a mid-rise building. The current building uses pneumatic controls for the entire building.
Confirm: Tenant WE calc can include Base Building rainwater system
CI-v4 WEp1:Indoor water use reductionposted by Brian Salazar on
Hello! I have a CI project where the tenant occupies multiple contiguous floors.
ASHRAE 50% AEDG
CI-v4 EAc2:Optimize energy performanceposted by AMY VAN DAM on
Can a project pursue the prescriptive compliance path if there is not a ASHRAE 50% Advanced Energy Design Guide that is specifically applicable to the base building (i.e.