Occupant Comfort Survey for residential projects?

NC-v4 INc1:Innovation
posted by  Erica Downs  on 

Under v3, residential projects were ineligible for this credit. Does anyone know if they are eligible under this v4 Innovation credit? Thanks!

2
Design Engineer
LEEDuser Expert
19 thumbs up
Tue Apr 17, 2018, 12:40 am

How to divert 70% of ongoing consumables?

EBOM-v4 MRc4:Solid waste management - ongoing
posted by  David Baker  on 

I have a project that is up for recertification next year and wants to pursue the MR credit for diverting ongoing consumables.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Fri Apr 13, 2018, 2:55 am

Preschool Occupancy

NC-2009 PIf3:Occupant and Usage Data
posted by  Heather Holdridge  on 

I received a preliminary design phase review comment on a preschool project for this PI form.  We entered identical values for the peak and average transient occupancy because the building is

3
Sustainability Director
Lake|Flato Architects
LEEDuser Premium Member
78 thumbs up
Thu Apr 12, 2018, 10:16 pm

repositioned non-historic building in a historic DISTRICT

CS-v4 LTc3:High priority site
posted by  Gail Napell  on 

we're renovating a NON-HISTORIC building in a HISTORIC district.  new façade, new MEP systems, structural upgrades.  Does this meet the intent of Option 1?

 

1
Tue Dec 4, 2018, 8:02 pm
4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Apr 12, 2018, 3:26 pm

NC-v4 MRc5 Option 2: Clarification of floor area for multi-phase renovation project.

NC-v4 MRc5:Construction and demolition waste management
posted by  Yasha Ogg  on 

I am working on a multi-phase project and I was wondering, does Option 2: Reduction of total waste material (Do not generate more than 2.5 pounds of construction waste per square foot of the b

1
Wed Apr 11, 2018, 1:23 pm

Area not in scope of project

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Carl Rappa  on 

We have a renovation & addition project where the CM wants to do the Option 2: Air Testing to achieve IEQc3.2.

0

Historic District

NC-v4 LTc3:High priority site
posted by  Ashlen Williams  on 

Our project site is determined to be eligible for the National Register of Historic Places. Does this eligibility satisfy the requirement? Thanks in advance for your feedback.

6
Design Engineer
LEEDuser Expert
19 thumbs up
Mon Apr 9, 2018, 4:13 pm

Lighting Controls in Unoccupied Spaces

EBOM-2009 EAc3.1:Performance measurement - building automation system
posted by  Clint Fogg  on 

Good afternoon, I am working on credit EAc3.1 for an EBOM project in an Office Building built in 1904.  I am looking for information with regards to the 100% lighting control statement. 

1
Wed May 2, 2018, 12:51 pm

Including Locker Rooms in IEQp1 Calculations

Schools-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Elizabeth Galloway  on 

We are currently working on completing the design documentation for a large high school pursuing LEED v4.