Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Lactation Room WEp1 Sink Calcs

NC-2009 WEp1:Water use reduction
posted by  Rob Hink  on 

We have a NC project that has a lactation room with a sink in the room of a cruise terminal. There will be 345 FTEs and 7,000+ Visitors on a daily basis.

1
Wed Apr 4, 2018, 8:57 pm

WEc1 Thresholds Tab

NC-2009 WEc1:Water efficient landscaping
posted by  H M  on 

Within the WEc1 "Thresholds" tab, there is a green button that reads "Submit". Are you supposed to click this button in order for the credit to be ready for review?

0

IEQ Space Matrix?

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Erica Downs  on 

Is the IEQ Space Matrix still relevant for this Prereq under v4?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Apr 3, 2018, 6:46 pm

Historical Exemptions from Requirements

Pilot-Credits PC14:Walkable Streets
posted by  Qiongwen Kong  on 

Has anyone had any experience with an exemption to a requirement due to a historical building or feature? This is regarding the requirement that no more than 30% of the primary façade can be witho

3
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Tue Apr 3, 2018, 4:09 pm

"CHECK FORM" doesn't work at the bottom of template IEQc5

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  H M  on 

I am unable to "CHECK FORM" at the bottom of my template IEQc5 in LEED online. The text "Incomplete.

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
378 thumbs up
Tue Apr 3, 2018, 3:25 pm

Report multiple electric meters on Energy Star Portfolio Manager

NC-2009 PIf1:Minimum Program Requirements
posted by  Edward Gulick  on 

I am (finally) wrapping up documentation on a multi-tenant building.  It is a LEED-NC project because over 50% of the leaseable space is owner-occupied.  The building has 4 electric

1
Mon Apr 2, 2018, 4:38 pm
4
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Mar 30, 2018, 2:50 pm

Documentation for Material Reuse?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Megan White  on 

What is required for documentation of material reuse? In the Ref Guide (p.535), it says projects should track original location of the material before remove.

3
Thu Mar 29, 2018, 4:19 pm

LEED ID+C CI commercial Interiors v4 water calc credit

CI-v4 WEc1:Indoor water use reduction
posted by  Robert Fernandez  on 

A little confused on this aspect of the credit....I was told buy a colleague that this credit can only apply to newly installed fixtures? and not base building restrooms that were not modified?

1
Thu Mar 29, 2018, 1:50 pm

Option 2 site area

CS-v4 SSc2:Site development - protect or restore habitat
posted by  Gail Napell  on 

Hi all

just confirming this is literally based on site area -i.e. our site is very small, so the cost is proportional. Thank you!

0