Forum quick links
Submit a Design Credit during Construction Application Review with a Split Submittal
posted by Felicia Ridgeway on
My project is a split submittal, with a Design Preliminary Application review and a Construction Application review.
Will "Overhead vegetated canopy" to be included in calculation for 25% minimum outdoor space?
NC-v4 SSc3:Open spaceposted by Qian P on
To satisfy SSc3 open space requirement, "A minimum of 25% of that outdoor space must be vegetated (turf grass does not count as vegetation) or have overhead vegetated canopy."
Will "Overhead vegetated canopy" to be included in calculation for 25% minimum outdoor space?
NC-v4 SSc3:Open spaceposted by Qian P on
To satisfy SSc3 open space requirement, "A minimum of 25% of that outdoor space must be vegetated (turf grass does not count as vegetation) or have overhead vegetated canopy."
Individual Occupant Space - Task Lighting
NC-v4 EQc6:Interior lightingposted by Daniel Thien on
I've seen several questions on this forum that address task lighting, but I still am a bit confused.
Alternative ASE Calculation - Direct sunlight based on lux differences between adjacent grid points
NC-v4 EQc7:Daylightposted by Adam Kyle on
Hello!
Fritting Question for Quality Views
Schools-NC-v4 EQc8:Quality viewsposted by David Ade on
LEED v4 states that “View glazing in the contributing area must provide a clear image of the exterior, not obstructed by frits, fibers, patterned glazing, or added tints that distort color bal
NC-2009 PIf3 - Occupant and Usage Data
NC-2009 PIf3:Occupant and Usage Dataposted by Felicia Ridgeway on
My new construction administrative office building project (federal project on a secure military base) has 750 full-time occupants (8 hour work day), 300 part-time occupants (4 hour work day), and
Reclaimed water use
NC-v4 WEc1:Outdoor water use reductionposted by Ann Runley Carroll on
If I am using all reclaimed/recycled water, do I still need to use the calculator. Where do I download the calculator? By using reclaimed/recycled water, do I get 2 points?
Brick and rubble in soil
NC-v4 MRc5:Construction and demolition waste managementposted by Marilyn Specht on
We are working on a LEED v4 project in an urban core. We are targeting 2 points for MRc5 and have an aggressive Construction & Demolition Waste Management Plan underway.