Forum quick links
Minimal requirements to meet Bicycle Facilities
NC-v4 LTc6:Bicycle facilitiesposted by Pournamasi Rath on
Hi,
How to Model unit heater in Basel & Proposed model following 90.1-2010?
Mid-Rise-v4 EAp2:Energy meteringposted by soham babu on
In my Proposed model(Design) I have DOAS with gas heating, VRF Fan coil units & Electric Unit heaters. following ASHRAE-90.1-2010,
Two Phase Renovation - Two phases of testing possible?
CI-v4 EQc4:Indoor air quality assessmentposted by Katherine Roth on
The commercial interiors project includes the renovation of an office space in two phases. 1/2 of the tenant space will be renovated in Phase I.
One HPD for Multiple Products
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Adam Yarnell on
Hi,
EAp2
CI-2009 EAp2:Minimum energy performanceposted by Steve Zuwala on
When listing non-energy star equipment we enter N/A in the Make or model column. This column is also used for Equivalent equipment as well, so the right had part of the form serves two purposes?
Biobased materials - Manufacturer declared conformance
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Danna Richey on
We have a project on which we're using a large amount of wool, and we'd like to be able to take credit for biobased materials. Since we're unable to find any
End use with multiple fuels
Retail-CI-v4 EAc3:Advanced energy meteringposted by Jared Silliker on
I'm working on a grocery project. Cooking will be a significant energy load, exceeding 10%, and will be gas-dominant.
Green-e endorsed carbon offset equivalent
NC-v4 EAc7:Green power and carbon offsetsposted by Conny Waltemath on
Hello - new to the site.
Interior Lighting Controls - Daylighting Controls
CI-v4 EAc2:Optimize energy performanceposted by Michael Archer on
The credit states the following: Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights for at least 25% of
Demolition includes Mechanical and Electrical equipment
NC-v4 MRc5:Construction and demolition waste managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
Assume a building to be demolished has large HVAC equipment and electrical gear, etc., and is not being reused but discarded.