Utility Bills for REC Green Power Calculations...

NC-2009 EAc6:Green power
posted by  Rick Alfandre  on 

The link below, fromLEEDuser, indicates that if you can use actual utility bills x 50% x 2 yrs to calculate the required quantity of RECs as opposed to the EAc1 energy model design consumption x 35

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Jan 18, 2018, 3:48 pm

Amtrak and Megabus

NC-v4 LTc5:Access to quality transit
posted by  Sara Zoumbaris  on 

Our project is shy of the second weekend trip threshold (108) by 1-ride. We are within walking distance of Amtrak, which has regularly scheduled pickups at our location twice a day.

5
Tue Jan 16, 2018, 6:37 pm

Existing building curtainwall reduced glazing %

NC-v4 EAp2:Minimum energy performance
posted by  Wade Cooper  on 

I have an existing envelope that is a complete curtain wall assembly that is to be replaced.  The overall WWR for the building is over 70% currently and is being removed and redesigned to

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Jan 16, 2018, 4:06 pm

Gross area v. net area in PI Form 3 and IEQ8.1

NC-2009 PIf3:Occupant and Usage Data
posted by  James Bell  on 

PI Form 3 requires gross area of Occupied Space.

5
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Mon Jan 15, 2018, 10:20 am

Owner Provided Signage

NC-2009 SSc7.1:Heat island effect - nonroof
posted by  Summer Minchew  on 

I have a project that will have owner provided signage (naming signage) mounted to architectural canopies.

0

Greencircle certified products

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Vanessa Nelson  on 

Will a Greencircle certified flooring product meet the requirements?

1
Fri Jan 12, 2018, 3:58 pm

Management of on site runoff at a neighboring retention pond

NC-v4 SSc4:Rainwater management
posted by  Jason Garvens  on 

I'm working on a project being built in a designated industrial park area.

1
Thu Jan 11, 2018, 6:49 pm

Demand Response Program available but building can't meet requirements

NC-v4 EAc4:Demand response
posted by  Jason Garvens  on 

Can a project still be eligible to apply for the single point for Case 2 if the project's utility does offer a DR program but the project doesn't sign up for it due to the requi

1
Thu Jan 11, 2018, 6:04 pm

Externally illuminated building signage

NC-v4 SSc6:Light pollution reduction
posted by  Gordon Wong  on 

I have a project in Auburn, CA for the California Conservation Corp.  The new building will have a stem mounted luminaire that will illuminate the building name.  Since this luminiar

3
Thu Jan 11, 2018, 2:04 pm

Using a weighted average to document exemplary performance

NC-2009 SSc7.1:Heat island effect - nonroof
posted by  Sara Goenner Curlee  on 

The hardscape for my project is mostly white concrete. However, in some areas the white concrete is edged by colored concrete which has SRI values outside the allowable range.

5
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Tue Jan 9, 2018, 3:48 pm