Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Refrigerants

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Peter Doo  on 

Can proper recycling and/or disposal of refrigerants be considered a waste stream for the purpose of LEED compliance?

1
Tue Oct 31, 2017, 8:08 pm

Porous materials fully enclosed building?

NC-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Summer Minchew  on 

I have seen IAQ specifications that state "Do not load or install drywall, other porous materials and components, and items with high organic content into partially enclosed building." Is this a re

1
Wed Nov 1, 2017, 3:07 pm

Operable Windows

CI-v4 EQc5:Thermal comfort
posted by  Sondra Camis  on 

In the Bird's Eye View comments above, it states that an operable window is considered a control for one person.

2
Sat Oct 28, 2017, 1:56 am

Sample VOC Calculator

CI-v4 EQc2:Low-emitting materials
posted by  Bill Eklund  on 

Does anyone have a sample VOC Calculator with smaple products filled in?

1
Mon Jan 29, 2018, 11:03 pm

Private Bathrooms

CI-2009 WEp1:Water use reduction
posted by  Susan Coy  on 

Hi, I am currently working on a Recreation Facility exclusively used for the Female Lacrosse Team, for calculating the water reduction, can I calculate the Lavatory Faucet as Private, it is only u

4
Default Avatar
Environmentally Sustainable Design Assistant
Aurecon
LEEDuser Basic Member
2 thumbs up
Thu Oct 26, 2017, 11:49 am

Critical Peak Pricing

NC-v4 EAc4:Demand response
posted by  RDK E&S  on 

I'm wondering if enrolling in a critical peak pricing tariff would qualify for this credit.

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Oct 26, 2017, 3:50 am

Table 1.4.7B - Proposed Air-Side HVAC System Schedule - Outdoor Airflow cfm

NC-2009 EAp2:Minimum energy performance
posted by  Maria Spastri  on 

Hi,

I need a couple of clarificaitons regarding the Outdoor Airflow that has to be listed in Table 1.4.7.B of the proposed systems. The project is located in California.

3
Default Avatar
Sustainability Consultant
AECOM
LEEDuser Basic Member
0 thumbs up
Wed Oct 25, 2017, 7:58 pm

LEEDv4-NC "Detailed" Checklist: does this exist?

LEED Rating System Selection
posted by  Erica Downs  on 

Posting here because I'm not sure where else to... 

3
LEED for Homes Techincal Development
US Green Building Council
LEEDuser Expert
38 thumbs up
Tue Oct 24, 2017, 4:02 pm

Saguaro Ribs

NC-2009 MRc7:Certified wood
posted by  Cindy Quinn  on 

I have a project that is using saguaro ribs as one of its building materials.  Do these ribs count as wood, and therefore need to be included in the total wood cost for MRc7?

1
Thu Oct 19, 2017, 2:58 am
3
Default Avatar
Designer
Rinkachung Architecture
LEEDuser Basic Member
1 thumbs up
Wed Oct 18, 2017, 4:09 pm