Forum quick links
Modular and Panelized construction
Mid-Rise-v4 MRc3:Construction waste managementposted by Michael Browne on
How should recycled and total waste be calculated and documented for v4 LEED Homes Midrise projects with off-site construction such as panelized walls, trusses, and modular projects?
Option 3 - Core Performance Guide???
NC-v4 EAp2:Minimum energy performanceposted by Erica Downs on
The prescriptive path under Option 3 still references the "Advanced Buildings Core Performance Guide". However, this guide has been "sunset" by NBI and no longer exists. Typic
Gas vented fireplace
NC-2009 EAp2:Minimum energy performanceposted by Carlos Vazquez on
I have a project were there is a 24,000 Btuh gas vented fireplace. Is a wall device mostly radiant heater (70-75%) with a glass panel which does not have a fan.
LDP for EBOM Recertification - Pros and Cons?
posted by Kimberlee Dobbins on
I know of one building attempting to use LDP for EBOM recertification. Has anyone successfully achieved recertification and willing to share the experience?
Maintenance Garage Baseline System
NC-2009 EAp2:Minimum energy performanceposted by Keith Lane on
I'm hoping someone can help me determine the appropriate Baseline system for a Vehicle Maintenance Facility for a LEED v2009 project. The total project area is about 34,500 s.f.
Project has shuttle to train station
NC-v4 LTc5:Access to quality transitposted by Lou Niles II on
The train station is just about 1mile from the projectHello I have a project in California with multiple shuttles that run short routes in the area of this NC building.
High Density Filing Systems
CI-2009 IEQc4.5:Low-emitting materials - systems furniture and seatingposted by Jason Cocek on
Does anyone know how high density filing systems fit into the IEQ credits for CI if at all?
Single-zone, multiple systems
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Nate Steeber on
Hey all,
I'm sorry if this is a repeat, I tried to search for this specific issue in the forum, and cannot find anything.
Farm on Roof
CI-2009 SSc1:Site selectionposted by Kristopher Croghan on
Our client currently has no landscape to maintain on site as this is a city office building. However, a roof farm is being considered.
EQ credit 2- Low emiting materials.
CI-v4 EQc2:Low-emitting materialsposted by Tracy Backus on
EQ Credit 2: Low-emitting materials Furniture evaluation.