Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Location of car/vanpools for project with perimeter parking strategy

NC-2009 SSc4.4:Alternative transportation - parking capacity
posted by  Sandy Mendler  on 

Our project has a total of 139 parking spaces at the perimeter of the campus, with ONLY ADA/handicap and six (6) short-term visitor spaces at a close in drop off area.

2
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Fri Sep 22, 2017, 10:03 pm

Bikes & Showers for Multiple Buildings

CS-v4 LTc6:Bicycle facilities
posted by  Sanyog Rathod  on 

We have three Core & Shell Buildings on one site. They are pursuing seperate certifications, and because of the small size of the projects, we are not doing a campus or group certification.

1
Tue Jan 15, 2019, 3:31 pm

Do Recycling Rooms need to be Negatively Pressurized?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Nicole Pandolfo  on 

Do recycling rooms need to be negatively pressurized to meet the requirements of Interior Cross-Contamination Prevention in LEED V4 now that recylcing rooms must include the collection of batteries

1
Wed May 11, 2022, 8:18 am

Basement renovation to a LEED Platinum Building

LEED Recertification: When and How
posted by  Faith Wilbert  on 

How do you go about a renovation in a LEED Plaitnum building? Do you have to do a recertification or another process. Theay are renovating 1 floor and I'm not sure the approach I need to take

1
Mon Apr 30, 2018, 11:23 pm

Change to Cx agent

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Cindy Quinn  on 

I'm working on a v4 project currently in CD design phase.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Sep 14, 2017, 1:13 am

ASHRAE Level II Audit qualification

EBOM-v4 EAc1:Existing building commissioning—analysis
posted by  Alexa Stone  on 

Can an ASHRAE Level II Audit conducted in 2014 qualify for usage for this credit?

5
Founder & Senior Consultant
Viable LLC
LEEDuser Basic Member
12 thumbs up
Wed Sep 13, 2017, 4:44 pm

Definition of "modification"

CI-v4 EAp2:Minimum energy performance
posted by  Todd Tewksbury  on 

This question is regarding the Energy and Atmosphere prerequisite Minimum Energy Performance and associated credit Optimize Energy Performance under the LEED v4 Interior Design and Construction rat

3
Default Avatar
Senior ESD Consultant
LEEDuser Basic Member
62 thumbs up
Wed Sep 13, 2017, 1:51 pm

Non-default Daily Use Values

Healthcare-v2009 WEp1:Water use reduction
posted by  Christie Morris-Withers  on 

What is non-default daily use values of water usage? How do I estimate them. This is required to be uploaded for the LEED-online WEp1. Thank you in advance for your help

3
Tue Sep 12, 2017, 6:30 pm

University Dorm with Designated Parking

NC-v4 LTc7:Reduced parking footprint
posted by  Heather Zeto  on 

I am working on a project located on a University Campus.  The building usage/type is most closely related to a dormitory.

0