Forum quick links
Is there a minimum % of new floors, walls, ceilings, etc. for a major renovation of an existing building under NC-v4?
NC-v4 MPR3:Must comply with project size requirementsposted by Craig Wilson on
Is there a minimum % of new floors, walls, ceilings, etc. for a major renovation of an existing building under NC-v4? We are trying to decide between O+M and NC for a major renovation.
MR Credit - 20% of WHAT number for the cutsheets
NC-2009 MRc4:Recycled contentposted by Denise Domino on
What are going off of for the 20%? 20% Material Cost???
SSc1 Path 12: EV Charging Stations
CI-2009 SSc1:Site selectionposted by Alaina Ladner on
How many EV charging stations are required to be provided to achieve this credit?
Thermal Comfort for Renovation of Historically Significant Building
NC-v4 EQc5:Thermal comfortposted by Heather Zeto on
Our project is a "Major Renovation" project for a historically significant buidling within a historic district.
V2. LEED Recertification
posted by Jason Zielsdorf on
I have a project that recieved LEED BD+C: New Construction v2 - LEED 2.2 in 2014. They recieved a credit for water reduction with low flow toilets.
Site calculations for single building part of a larger complex
NC-v4 SSc2:Site development - protect or restore habitatposted by MICHAEL LOPEZ on
We have a five-acre site with multiple buildings. However, we are pursuing certification for only one of the buildings. Does the entire site have to meet the prerequisite?
EA-p2: EnergyStar TargetFinder Score
CI-v4 EAp2:Minimum energy performanceposted by Nikhilesh Srinivasan on
My project is an office tenant fitout (1 floor in a high-rise building).
Group projects w/ DES / central plants
CS-2009 EAp2:Minimum energy performanceposted by Stacey Olson on
This is with regard to an open air shopping plaza, which is registered as a group project with 7 structures. We received guidance to follow the “Treatment of District or Campus Thermal Energy in
Lead Lined Doors
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Tim Murray on
We have a lead-lined door for a dentist x-ray room. The manufacturer cannot confirm that the particle board core is formaldehyde free.
Preproject water bodies
ND-Plan-v4 SLLp3:Wetlands and water body conservationposted by Sarah Kearney on
Hello, What does 'preproject' really mean? Our project is located near a river. Currently there is one building with docks within 50 ft. of the water.