Bird Collision Deterrence: Summary of Material Threat Factors
Pilot-Credits SSpc55:Bird collision deterrenceposted by Alysa Hoffmeister on
What is the process to have additional materials submitted, approved and added to the Bird Collision Deterrence: Summary of Material Threat Factors document?
Green-E Equivalency
EBOM-2009 EAc4:On-site and off-site renewable energyposted by David Ellner on
We have pursued EAc4, using a combination of on site and off site renewable energy sources. On site sources is not a problem.
EApc95 - Alternative Energy Performance Metric questions
NC-2009 EAc1:Optimize energy performanceposted by Jamy Bacchus on
This pilot credit includes a XL file with tables B through H to calculate savings in terms of GHGs, site energy, source energy, energy cost, peak demand and "if available": TDV and Primary Energy F
Interpretation for Underground Stormwater Retaining System
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Candice Rogers on
Good morning - We have a project that is greenfield.
Ventilation Effectiveness
posted by Dustin Balton on
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air.
Autocontrol vs smart sensor-activated faucets and duration times
NC-v4 WEp2:Indoor water use reductionposted by Heather DeGrella on
Per the LEEDv4 Reference Guide "Duration-based savings from auto-control faucets w/ automatic fixture sensors or metering controls are no longer allowed in the design case.
EBOM 2009 IEQ3.2 Alternative Compliance Path
EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessmentposted by Kimberly Hosken on
Our project is a five story public building with operational contracts which include "contract document requirements".
Regularly Occupied or Not?
NC-2009 IEQc8.1:Daylight and views - daylightposted by Cynthia Estrada on
Hello- I don't know if anyone has asked this question or not, it is a rather unique situation.
what all is included in material cost
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Brianna Brandsen on
Is labor to deliver (i.e. drive time, time to unload materials, and / or shipping costs from suppliers) and / or unload materials on a job site included in the material cost?
Utility sells "Community Solar" in yearly blocks - NOT Green-e
NC-2009 EAc6:Green powerposted by Joyce Kelly on
The local Utility sells "Community Solar" in yearly blocks - is NOT yet Green-e certified but willing to provide all the data required to be Green-e certified.