Forum quick links
Move-in versus construction
posted by Mark Donahue on
Is there a system that can be used for a simple move in (furniture only) for a commercial office space in a non-LEED-certified building?
WELL Certification Estimation Calculation
posted by Carina Clark on
Our team is trying to estimate about where our project is in achieving WELL certification (and at what level) prior to registration.
Concrete Regional and Recyle Content
NC-2009 MRc5:Regional materialsposted by Rick Alfandre on
I'm trying to verify the appropriateness of our approach to concrete for MR 4 and 5. Using the Materials Calculator and Tracker form; Concrete - total cost is the cost of concrete delivered to th
NC-v4: Rainwater management
NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project? The initial pond will be des
Off site signage for Low-Emitting- Hybrid parking spaces
Schools-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Vada Kornegay on
If I have no parking spaces in my LEED boundary, is it ok to have my Low-Emitting parking adjacent to the site? forgive me if this has been answered/asked by someone else.
Thermal Barrier Tape and EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Jennifer Webb on
I talked to a leading manufacturer of thermal barrier tape which typically requires an EPD to be included in the credit.
Narrative explaining compliance of ESC plan with NPDES guideline
NC-2009 SSp1:Construction activity pollution preventionposted by Madhura Dhayagude on
Hi, We are currently in Construction review for a MFHR project based in Philadelphia, PA.
Energy Recovery Bypass
NC-2009 EAp2:Minimum energy performanceposted by Kalyan Nishtala on
Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.
Certification Process for a Green Cleaning Product
EBOM-v4 EQp3:Green cleaning policyposted by Franklin Raines on
What is the certification or approval process for Green Cleaning Products compliant as part of a LEED-EBOM program?
UCSB - Bren Hall
Pilot-Credits IPpc96:LEED Labposted by Brandon Kaysen on
We are very excited to be wrapping up our third LEED Lab project at UCSB. This ear we are certifying the iconic Bren Hall under Version 4 of the EBO&M rating system.