Forum quick links
Peak Transients
Schools-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by timothy thomas on
The following is review comment I received for SS 4.2. "Refer to the comments within PIf3: Occupant and Usage Data.
NPDc11: are townhomes single dwelling or multiunit buildings
ND-v2009 NPDc11:Visitability and universal designposted by Megan Shelby on
For NPDc11 Visitability and Universal Design, are townhomes considered single dwelling unit buildings or multiunit buildings?
Core Performance Guide
NC-2009 EAp2:Minimum energy performanceposted by Tricia Loe on
I have a project that is considering using the Core Performance Guide option for compliance with this credit.
Plant Design for Proposed bldg
NC-2009 EAp2:Minimum energy performanceposted by Julian Park on
If a new building will be served by an existing chiller plant that already serves an existing building, does the Plant design for the Proposed Alternative need to model the full chiller size, even
Is it OK to use different units of measurement for MRc6 + MRc7?
EBOM-2009 MRc6:Solid waste management - waste stream auditposted by Craig Wilson on
A client had a waste audit done for MRc6 in weight (36% landfill diversion) and we analyzed MRc7 in volume (55% landfill diversion).
Ceramic Tile Reporting on LEED IEQ4.3 Form
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Rachael Vidulich on
We have ceramic tile flooring on our project and I understand this is exempt from the testing requirements but do you need to list it on the IEQ4.3 form?
short term bicycle storage
NC-v4 LTc6:Bicycle facilitiesposted by sue bryant on
Can this be located inside a building as long as it is within 100' of the main entrance?
2009 BD+C and 2009 CS on Campus site- SSc4.2
posted by Deborah Lucking on
SSc4.2 is listed as a "Campus" credit. However, we have one project that is pursuing Major Renovation, and another pursuing Core & Shell certification.
Download Forms
NC-2009 PIf1:Minimum Program Requirementsposted by Ralph Bicknese on
Hello, I am currently working on a project in which we need independent specs for LEED and we are considering to facilitate the LEED forms to the Contractors so they can get familiar with them bef
Proximity to rail station
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Sheryl Swartzle on
Our one and only bus, which stops right outside our project entrance, is a 10 minute drive in heavy traffic (meaning many rides would be less than 10 minutes) but 3.5 miles to a Metro Rail station.