Forum quick links
Diverse "publicly available" use
NC-v4 LTc4:Surrounding density and diverse usesposted by Gina Rossi on
Working on a NC project on a private college campus and wondering how rigid USGBC is in defining "publicly available".
CHP Plant Electricity Generation Credit and Efficiency Calcs
NC-2009 EAc1:Optimize energy performanceposted by MKK LEED on
We are working on a higher ed. project building connected to a campus-wide district heating/cooling and power plant.
Regularly Occupied Spaces Consistency Across All Credits
CS-2009 IEQc8.2:Daylight and views - viewsposted by Summer Minchew on
We provided a sample floor plan of future tenant area to document this credit.
ID credit in a hospital?
Schools-2009 IEQc10:Mold preventionposted by Payette Library on
We're thinking about going for this credit for a Hospital project (NC v2.2), since code requires all hospitals to have strict mold prevention measures.
The envelope data for old building (baseline) are not avaiable
NC-2009 EAp2:Minimum energy performanceposted by James Lee on
Hi, I am modeling campus building under major renovation. But since that building was built in 1968, no envelope data available (no spec.
Innovation In Design Credits
NC-2009 IDc1:Innovation in designposted by Brian Harris on
After a design or construction submittal review, if one (or more) of the ID credits is not accepted, may it be replaced with a different ID attempt on the re-submittal? Myles Huddart LEED AP BD+C
Appeal after second review
posted by Johnathan Woodside on
I guess my question is; does the second review include review of changes made as a result of comments made during the second review?
Does FloorScore apply to subfloor surfaces?
CI-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Edgar Arevalo on
I have a project where I received a submittal for a subflooring hard surface material.
LEED Boundary and Non-contiguous reconfigured areas
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aaron Ketner on
Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.
System Type 9 Baseline Fan Sizing
NC-2009 EAp2:Minimum energy performanceposted by Brian Kenney on
I am working on a job with the Army Corps of Engineers that has a vehicle maintenance workbay with general exhaust requirements of 1.5 CFM/SF dictated by the RFP.