Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Required to use facility weighted average?

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Eileen Gohr  on 

"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility." Does this mean that proje

0

Integrative Pilot Credit - Design or Construction Credit

Pilot-Credits PC60:Integrative Process
posted by  Devki Wright  on 

Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?

1
Tue May 24, 2016, 12:12 am

Duct Testing and Cleaning

NC-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Ramon Ramos  on 

What is the criteria for triggering duct testing and cleaning reports for both plans?

1
Tue Aug 29, 2017, 1:23 am
1
Fri Jul 22, 2016, 5:23 pm

90% controls for open office systems furniture

CI-2009 IEQc6.1:Controllability of systems - lighting
posted by  Brian VanAllen  on 

As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?

0

Multi-family Mid-rise EA Pre-req 1 - Option 2

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Pournamasi Rath  on 

Hi, I have a quick question regarding LEED for Homes Multi-family Mid-rise EA Pre-req 1 - Option 2 (see reference document here - http://www.usgbc.org/sites/default/files/Energy%20and%20Atmosphere%

1
Thu Jan 26, 2017, 8:53 pm

feedback

Pilot-Credits EApc65:Monitoring based commissioning
posted by  emily reese moody  on 

There was some confusion at the on start of the process as to who owned the analyzing and reporting of the data.

0

Baseline system for hybrid service hot water system

NC-2009 EAp2:Minimum energy performance
posted by  Vernon Smith  on 

Our Proposed project (LEED 2009 NC) has a hybrid service hot water system that uses a water-source heat pump as the primary hot water generator and has a heat exchanger as a backup downstream of t

1
Fri Apr 7, 2017, 1:26 pm

Golf Course Clubhouse Project Advice

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Johanna Hendricks  on 

Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.

1
Wed Oct 29, 2014, 3:44 pm

Core and shell within an NC

NC-v4 EQc8:Quality views
posted by  Susan Di Giulio  on 

We are workingon a 3 story makers lab and classroom building at a university. The third floor is being built as core and shell for a future decision on use.

1
Mon Aug 28, 2017, 11:35 am