Campus Site Lignting Calcs - again, sorry
CS-2009 EAp2:Minimum energy performanceposted by charles bell on
We submitted (on Jan 23, 2014) the question below. Unfortunately, since then my email has crashed and I have lost the response. Is there any way this can be recovered?
Zero Lot Line calc
NC-v4 SSc4:Rainwater managementposted by Janika McFeely on
Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?
open grid paving and gravel
NC-2009 SSc7.1:Heat island effect - nonroofposted by Erin Holdenried on
What qualifies as "open grid paving"? Can a gravel bed designed to be 50% pervious qualify as "open grid paving"? Thanks
Land disturbed vs. land supporting normal building operation
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michelle Bombeck on
This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.
High Pressure Sodium lamps--interior or exterior?
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Maria Unruh on
The table MRp2-2, is this for HPS lamps for the entire project or for the interior only?
Blowout toilets in v4
NC-v4 WEp2:Indoor water use reductionposted by Ben Roush on
In v2009, you could use 3.6 GPF blowout toilets in institutional uses, but could not show savings for using blowout toilets with lower flow.
Addition To An Existing Certified Building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Timothy VanOudenhoven on
I am currently working on a project where an existing certified building will have major renovation to the interior of the existing and an addition added to the existing certified building. There w
EBOM MRc4: Reduced Mercury in Lamps - High Rise Residential?
NC-2009 IDc1:Innovation in designposted by Erica Downs on
Has anyone had experience submitting this for a high-rise residential project?
Bicycle Shower Facilities
NC-v4 LTc6:Bicycle facilitiesposted by S. Sachs on
Follow up question to Miles's question about the shower facilities in an adjacent building: I have a similar building that is being built part of a school campus, in which the building adjacent t
Non-LEED-Certifiable Buildings on Site
CS-2009 MPR3:Must use a reasonable site boundaryposted by Krissy Buck Flickinger on
Hello everyone- I have basically two questions in one, regarding how to treat additional buildings on your site. Project Background: I have an 880,000 SF site.