Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Compliance for Corporate Interiors?

Pilot-Credits EQpc78:Design for active occupants
posted by  Rachel Bannon-Godfrey  on 

Our project is utilizing a 3-story interconnecting stair inside a corporate office space on floors 8,9,10.

1
Thu Jun 9, 2016, 3:09 pm

ID credit Green Cleaning Policy without walk-off mats

CI-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Rachel Bannon-Godfrey  on 

We have a project that is not achieving IEQc5 as walk-off mats conflict with the operational aspects of the building. Can we still apply for an ID credit for a green cleaning policy?

1
Thu Aug 4, 2016, 10:30 am

CO2 Monitors in Waiting Room Without 4 Walls

CI-2009 IEQc1:Outdoor air delivery monitoring
posted by  Michelle Halle Stern  on 

I'm working on a HC interiors project with waiting rooms and nurse stations that have density of 25 people/1000sf, however they do not have 4 walls enclosing the spaces.

1
Tue Sep 8, 2015, 3:29 pm

v09 Water Use Reduction Additional Guidance available

NC-2009 WEp1:Water use reduction
posted by  RETIRED   on 

As part of the October 2016 LEED addenda update (http://www.usgbc.org/articles/leed-addenda-update-october-2016), USGBC updated the Water User Reduction Guidance document to Version 9 (http://www.u

0

Maximum number of ID points allowed

CI-2009 IDc1:Innovation in design
posted by  javier torres  on 

Hi there, I'm working on LEED NCv2009 project and trying to find out if there is a limit as to how many points can be earned in the ID category. The LEED checklist shows up to 6 points (1.1 thru 1.

1
Tue Sep 15, 2015, 10:30 pm

Custom Walk-In Freezers and Refrigerators

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  David Hryvniak  on 

I am working on a project with commercial food service equipment. The equipment includes a few custom walk-in freezers and coolers.

1
Fri Jan 8, 2016, 10:08 pm

"Categorized as an Office Space"

CS-2009 EAc1:Optimize energy performance
posted by  Aaron Frantz  on 

We are proposing a new mixed use multi-story to be submitted under NC, v2009. The first floor will be cold dark shell space for future retail/restaurant tenants.

1
Mon May 1, 2017, 1:49 pm

What if landscaping isn't installed yet?

EBOM-2009 WEc3:Water efficient landscaping
posted by  Vanessa Seibert  on 

We are in the PP but do not have our low-water landscaping installed. A contract will be signed to install it prior to the end of the PP. Has anyone obtained the credit this way?

1
Thu Sep 24, 2015, 5:23 pm

MRp1 Can a designated dumpster serve as my area of recycling?

NC-2009 MRp1:Storage and collection of recyclables
posted by  Shelly Christman   on 

Hello All, We have a 140,000 SF shell & Core project that is mixed use 1st floor and office space floors 2-6. We are using LEED 2009 C&S.

1
Wed Jan 27, 2016, 6:06 pm

LEED Online Not Displaying Multiple Credit Assignees

General forums
posted by  Peter Warren  on 

If I am NOT the a project’s LEED Administrator, how can I see the full list of team members to whom a credit is assigned (i.e. when it is assigned multiple people)?

0